Pro or Educator access required

This module requires a Pro or Educator account. Sign in with one to continue, or contact us for access.

← Portfolio ← DC Solutions

AI Data Hall OperationsDH-01 | GB200 NVL72 | Live Telemetry

    --:--:-- WIB

Building Overview

Primary read: where is the alarm and where do I click next?
Click any floor to explore room layout — 72m × 48m × 4 levels — 13,824 m² total
PUE
1.30
Derived | Target ≤1.12
WUE
0.00
L/kWh · Dry-only
CUE
0.90
kgCO₂/kWh IT
IT Load
14.26
MW · Scenario A locked
GPUs
7,776
Blackwell
NVL72
108
Domains
Uptime
99.99
% YTD
Alarms
0
Active
Data Center Facility

Electrical

TX-A/B5MVA Online
UPS-A/B4.5MW Online
Busway2×4,000A
GenSet4×2.5MW Standby

Cooling

TCS Sup35.2°C
TCS Ret44.8°C
CDUs36/48 fac · 9/12 hall
Chillers12/16 Run · design

Network

NVLink5All Up
IB XDR800G Online
OOB/BMCActive

Safety

Fire/VESDANormal
EPOArmed
Leak DetectClear

Access

Personnel3 Inside
Last Entry12:34
Primary read: where are the outliers — thermal, power, cooling margin?
PUE
1.30
Derived | basis ▾
IT
3,564
kW
GPU%
94
1,944
NVLink
100%
27dom
ΔT
9.6
°C
DLC
85%
3.03MW
Up
99.998
%
W/GPU
1050
avg
FP4
1400
EF
DATA HALL — 32m×20m — 640m² — ≥3,500kg/m² — 4.2m clear — Zone 4
AI RackNetworkPassiveCDU (EoR)In-Rack CDU▲Hot▼Cold◆TTHT― OH Pipe

Rack Architecture

Primary read: how is an NVL72 built — and what is the current risk on the selected rack?
Specifications & detail panels

Cooling & Piping P&ID

Primary read: where is the heat going — and what is the cooling constraint right now?
Specifications & detail panels

Facility Electrical SLD

Primary read: what is energized, what is loaded, what is at risk of trip?
Specifications & detail panels

DH-01 Electrical SLD

Specifications & detail panels

DH-02 Electrical SLD

Specifications & detail panels

DH-03 Electrical SLD

Specifications & detail panels

DH-04 Electrical SLD

Specifications & detail panels

Network Fabric Topology

Primary read: what is the fabric health — congestion, packet loss, degraded redundancy?
Specifications & detail panels

Fire Detection & Suppression P&ID

Primary read: what is the current protection state — and what is bypassed?
Specifications & detail panels

BMS/DCIM Architecture

Primary read: is the monitoring system itself trustworthy?
Historian: Online· 1 yr hi-res + 5 yr daily Notification: Online· email + SMS + push Gateways: 16 / 16online Alarms: 0 active·0 ack·0 cleared
Protocol & specification tables (Modbus / BACnet / OPC-UA / SNMP)

CDU-01 HMI

Online

Component Detail

Block Diagram

SLD Mimic

ENERGIZED
RESULTS

CH-1 HMI

RUN

CT-1 HMI

RUN

Equipment HMI

Online

In-Rack CDU HMI

Online

CRAH HMI

Active

Corridor Service

Online

SCiB ESS 480VDC — System View

Normal