Data Mode: Simulated Legal & methodology notice — independent personal research, educational/estimation only, not professional advice. View details
This AI data hall dashboard is independent personal research based on publicly available standards and references. It does not represent any current or former employer.
All metrics and calculations are for educational and estimation purposes only, not legal, financial, investment, procurement, safety, or engineering advice. Validate final decisions with qualified professionals and local regulations.
Use of this site is subject to our Terms and Privacy Policy. All rendering runs in-browser.
Building Overview
Primary read: where is the alarm and where do I click next?
Click any floor to explore room layout — 72m × 48m × 4 levels — 13,824 m² total
PUE
1.30
Derived | Target ≤1.12
WUE
0.00
L/kWh · Dry-only
CUE
0.90
kgCO₂/kWh IT
IT Load
14.26
MW · Scenario A locked
GPUs
7,776
Blackwell
NVL72
108
Domains
Uptime
99.99
% YTD
Alarms
0
Active
Electrical
| TX-A/B | 5MVA Online |
| UPS-A/B | 4.5MW Online |
| Busway | 2×4,000A |
| GenSet | 4×2.5MW Standby |
Cooling
| TCS Sup | 35.2°C |
| TCS Ret | 44.8°C |
| CDUs | 36/48 fac · 9/12 hall |
| Chillers | 12/16 Run · design |
Network
| NVLink5 | All Up |
| IB XDR | 800G Online |
| OOB/BMC | Active |
Safety
| Fire/VESDA | Normal |
| EPO | Armed |
| Leak Detect | Clear |
Access
| Personnel | 3 Inside |
| Last Entry | 12:34 |
Primary read: where are the outliers — thermal, power, cooling margin?
PUE
1.30
Derived | basis ▾
IT
3,564
kW
GPU%
94
1,944
NVLink
100%
27dom
ΔT
9.6
°C
DLC
85%
3.03MW
Up
99.998
%
W/GPU
1050
avg
FP4
1400
EF
AI RackNetworkPassiveCDU (EoR)In-Rack CDU▲Hot▼Cold◆TTHT― OH Pipe
Rack Architecture
Primary read: how is an NVL72 built — and what is the current risk on the selected rack?
Specifications & detail panels
Cooling & Piping P&ID
Primary read: where is the heat going — and what is the cooling constraint right now?
Specifications & detail panels
Facility Electrical SLD
Primary read: what is energized, what is loaded, what is at risk of trip?
Specifications & detail panels
DH-01 Electrical SLD
Specifications & detail panels
DH-02 Electrical SLD
Specifications & detail panels
DH-03 Electrical SLD
Specifications & detail panels
DH-04 Electrical SLD
Specifications & detail panels
Network Fabric Topology
Primary read: what is the fabric health — congestion, packet loss, degraded redundancy?
Specifications & detail panels
Fire Detection & Suppression P&ID
Primary read: what is the current protection state — and what is bypassed?
Specifications & detail panels
BMS/DCIM Architecture
Primary read: is the monitoring system itself trustworthy?
Historian: Online· 1 yr hi-res + 5 yr daily
Notification: Online· email + SMS + push
Gateways: 16 / 16online
Alarms: 0 active·0 ack·0 cleared