Legal Notice
This AI data hall dashboard is independent personal research based on publicly available standards and references. It does not represent any current or former employer.
All metrics and calculations are for educational and estimation purposes only, not legal, financial, investment, procurement, safety, or engineering advice. Validate final decisions with qualified professionals and local regulations.
Use of this site is subject to our Terms and Privacy Policy. All rendering runs in-browser.
Building Overview
Click any floor to explore room layout — 72m × 48m × 4 levels — 13,824 m² total
PUE
1.08
Target ≤1.12
WUE
0.42
L/kWh
CUE
0.38
kgCO₂/kWh
IT Load
28.5
MW (4 Halls)
GPUs
7,776
Blackwell
NVL72
108
Domains
Uptime
99.99
% YTD
Alarms
0
Active
Electrical
| TX-A/B | 5MVA Online |
| UPS-A/B | 4.5MW Online |
| Busway | 2×4,000A |
| GenSet | 4×2.5MW Standby |
Cooling
| TCS Sup | 35.2°C |
| TCS Ret | 44.8°C |
| CDUs | 96/96 N+1 |
| Chillers | 12/16 Run |
Network
| NVLink5 | All Up |
| IB XDR | 800G Online |
| OOB/BMC | Active |
Safety
| Fire/VESDA | Normal |
| EPO | Armed |
| Leak Detect | Clear |
Access
| Personnel | 3 Inside |
| Last Entry | 12:34 |
PUE
1.08
≤1.12
IT
7,128
kW
GPU%
94
1,944
NVLink
100%
27dom
ΔT
9.6
°C
DLC
84%
7.2MW
Up
99.998
%
W/GPU
1050
avg
FP4
1400
EF
AI RackNetworkPassiveCDU (EoR)In-Rack CDU▲Hot▼Cold◆TTHT― OH Pipe