Fuel Process — bulk storage → transfer → conditioning → day tanks → gensets
UST-01UNAVAILABLE
P-101UNAVAILABLE
FPU-01UNAVAILABLE
Day Tks—
GensetsUNAVAILABLE
Transfer DirectionUNAVAILABLE
Bulk Storage — UST-01
—
—
—
Inventory basis: — Usable reserve is what backs the autonomy figure (conv/review/09-engineering-basis lines 133–147).
Tank Inventory
| Tag | Level | Volume | Serves |
|---|
Bulk Fill Point
Fill CouplingUNAVAILABLE
Overfill PreventionUNAVAILABLE
Fill Rate—L/min
Transfer Pump & Fuel Quality
P-101 · Lead Transfer
Viking L124A · 180 L/min
Current—A
Disch Press—bar
Flow—L/min
Vibration—mm/s
Run Hours—h
Starter—
FPU-01 · Fuel Conditioning / Polishing Loop
UNAVAILABLE
UNAVAILABLE · engine authority requiredDP — · WIF —
Polisher Diff Press—bar
Water-in-Fuel—ppm
Day Tanks & Gensets
Day-tank logic: P-101 lifts UST → the running genset's day tank. Low-low (<25%) raises a critical interlock alarm and forces lead pump to RUN. DT serves a single genset; failover to N+1 standby genset on engine fault.
Safety Interlocks
Bund / Sump LeakUNAVAILABLE
Bund Sump LevelUNAVAILABLE
Water-in-FuelUNAVAILABLE
Fuel PolishingUNAVAILABLE
Day Tank Low-LowUNAVAILABLE
Pump Fail-to-RunUNAVAILABLE
LDS-101Double-wall interstitialUNAVAILABLE
LS-102Bund sump levelUNAVAILABLE
P-101 PERMTransfer permissiveUNAVAILABLE
XV-101 PERMBulk-fill permissiveUNAVAILABLE
UNAVAILABLE · engine authority required
Active Alarms & Events
UNAVAILABLE — alarm authority required
UST Level Trend (1 h)
Range80–90% · 60 min