← All incidents
Incident dossier · Rank #49 · magnitude 3.8

Digital Realty Los Angeles (El Segundo) Data-Center Fire (May 2023)

Digital Realty 2023-05-21 restoration time not established Fire

Summary

A fire in server/equipment space at Digital Realty's Los Angeles (El Segundo) data center caused localized customer outages and equipment loss.

Users affected
Colocation customers at the LA facility (localized)
Duration
Onset 01:40 PT 21 May; Colo 3 back ~1 h, Colo 4 down several days with no restoration time given.
Financial
Not published
Scope
Facility fire (localized)
Site
Digital Realty LAX (El Segundo, Los Angeles) · El Segundo, California, United States
Services down
Colocation customers at Digital Realty LA (localized)

How the defences failed

How the defences failed — Digital Realty7 failure modes in the order the sequence of events first shows them, 0 latent conditions with no moment in the record, ending in the outcome: Colo 4 dark for days · servers lost.ACTIVE — IN THE ORDER THE RECORD SHOWS THEMFM-01 · RPN 252Rack ignition, no causeS7 · O4 · D9FM-02 · RPN 270No early detection on recordS6 · O5 · D9FM-03 · RPN 144Water on energised serversS6 · O4 · D6FM-04 · RPN 120Unburned suite also darkS5 · O4 · D6FM-05 · RPN 252Colo 4 dark for daysS7 · O4 · D9FM-06 · RPN 216Operator silent for daysS4 · O6 · D9FM-07 · RPN 288Cause stays undeterminedS4 · O8 · D9OUTCOMEColo 4 dark for days · servers lostLEGENDMedium or low priorityMedium or low priority, no published actionNext failure in the record
How the defences failed — Digital Realty7 failure modes in the order the sequence of events first shows them, 0 latent conditions with no moment in the record, ending in the outcome: Colo 4 dark for days · servers lost.ACTIVE — RECORD ORDERFM-01 · RPN 252Rack ignition, no causeS7 · O4 · D9FM-02 · RPN 270No early detection on recordS6 · O5 · D9FM-03 · RPN 144Water on energised serversS6 · O4 · D6FM-04 · RPN 120Unburned suite also darkS5 · O4 · D6FM-05 · RPN 252Colo 4 dark for daysS7 · O4 · D9FM-06 · RPN 216Operator silent for daysS4 · O6 · D9FM-07 · RPN 288Cause stays undeterminedS4 · O8 · D9OUTCOMEColo 4 dark for days · servers lostLEGENDMedium or low priorityMedium or low priority, no published actionNext failure in the record
Every failure mode of the FMEA below. Active modes run in the order the sequence of events first shows them — record order, not a proof of cause; latent modes were in place before the event. Red outline: high priority. Dashed: no published corrective action.
Magnitude sub-scores (0–10)Magnitude sub-scores (0–10)Users 4Users affected (0–10) — breadth of the user/customer population impacted. — scored 4/10.Financial 3Financial impact (0–10) — direct + consequential cost. — scored 3/10.Duration 4Outage duration (0–10), from the measured duration by fixed bands: <1 h 3 · 1–4 h 4 · 4–12 h 5 · 12–24 h 6 · 1–3 d 7 · 3–7 d 8 · 7–30 d 9 · >30 d 10; no customer downtime 1. — scored 4/10.Blast 4Blast radius (0–10) — how wide the fault propagated across systems/regions. — scored 4/10.
Magnitude 3.8 = blast 4×0.35 + users 4×0.25 + financial 3×0.20 + duration 4×0.20 (sub-scores 0–10 · weighted composite)

Equipment/server fire caused localized outages and equipment loss at the LA facility — sub-scores ESTIMATED from public impact reporting, pending deep research.

All 12 impact metrics
Fire origin time1:40am local (PT), Sun 21 May 2023
Fire origin locationColo 4 suite, row 4, a specific rack
Colocation suites shut by fire dept2 (Colo 3 and Colo 4)
Fire spread containmentLimited to row 4, some exposure to adjacent rows
Colo 3 (unburned) power outage~1 hour ('after an hour or so')
Colo 4 (origin) power outageSeveral days (still down ~3 days later)
Servers lost / water-damagedUnknown number ('many' water-damaged)
Facility floor area132,000 sq ft (two-story)
Facility UPS capacity7.45 MW
Suppression type / outcomeWater fire sprinkler (sub-type not disclosed); activated, contained fire, caused water damage
Reported injuriesNone stated in any source (not an affirmative zero)
Official root causeUndetermined

Sequence of events

  1. TRIGGER Fire breaks out in a specific equipment rack in the Colo 4 colocation suite at Digital Realty LAX12, 2260 E El Segundo Blvd, El Segundo; ignition cause undetermined. Time per an Evocative incident report cited by DCD.
  2. DETECTION No aspirating/VESDA smoke detection or first-alarm time is documented in any source; the earliest recorded protection response is the heat-activated sprinkler, implying heat/smoke had already built up in the cabinet before any alarm on record.
  3. MITIGATION The fire sprinkler system activates in the Colo space above row 4 (water suppression; sub-type not disclosed by sources), discharging onto the IT load below.
  4. MITIGATION Sprinkler discharge contains the fire — 'limited to row 4 with some exposure to adjacent rows' per a Digital Realty report cited by DCD — effective as a fire-stop.
  5. CASCADE Sprinkler water inflicts collateral damage: the discharge 'result[ed] in water damage to many servers' in the colocation space, shifting the loss mode from thermal to hydraulic.
  6. MITIGATION Fire department responds and closes two colocation suites (Colo 3 and Colo 4) — 'Two colo halls closed by fire department after a blaze in the racks.' No call/arrival time, apparatus count, or on-scene tactics are public.Fire & rescue commander
  7. MITIGATION 'Power was cut off to the Colo 3 and 4 spaces' as part of the fire-response de-energisation.
  8. CASCADE De-energisation reaches the unburned Colo 3 suite — a tenant reported it 'appears to be safe' — taking down customers whose racks were never on fire; cross-suite impact beyond the fire origin (physical adjacency inferred, not stated).
  9. RECOVERY 'Power was restored to Colo 3 after an hour or so'; the unburned suite comes back while Colo 4 remains de-energised.
  10. IMPACT No fire spread beyond the two suites; event contained to Colo 4 row 4 plus limited adjacent-row exposure. No injury statement appears in any source (record is silent, not an affirmative zero).
  11. IMPACT Aftermath: a Colo 3 tenant reports the lobby 'absolutely packed with people waiting to get access to Colo 4,' conference rooms that 'looked like a battle zone,' and 'The smell of smoke was intense, and the cleaning chemicals too.' Some users still locked out a day later.Customer
  12. IMPACT Evocative (operating as Krypt, holding former VPLS/INAP assets) loses an unknown number of servers; water damage was 'particularly severe' for it.Customer
  13. IMPACT Colo 4 still without power roughly three days after the fire; a tenant reports 'I contacted Digital Reality and they were tight-lipped, only responding with empty words' — no recovery ETA communicated.Customer
  14. RECOVERY Colo 4 'remained out of commission for several days' before restoration; recovery bounded by water-damage remediation and equipment replacement rather than fire repair.
  15. RESTORED DataCenterDynamics (Peter Judge) publishes the only primary press account and states it has contacted Digital Realty for more information; cause remains officially 'undetermined' and no operator or fire-authority root-cause analysis is subsequently published.

Response by role

9 roles/4 recorded actions/40 playbook actions across 7 failure modes/no recorded action: First responder, Incident commander, Authorised electrical person, Safety officer, Service recovery lead, Communications lead, Authority / investigator

What each role did

Roles the sequence of events shows acting; every entry quotes its source line. Select a time to jump to it.

Role
Detect
Contain
Recover
Fire & rescue commanderThe fire department that closed Colo 3 and Colo 4 — agency not named
no record
no record
CustomerColo 3 and Colo 4 tenants, including Evocative (Krypt)
no record
no record

Role by role

Recorded actions / playbook actions per role. A role with 0 recorded actions does not appear in the sources.

Digital Realty LAX12 on-site staff — no one is named; no alarm or first-sighting is recorded — Meets the first alarm: on-shift technician or security in a facility, on-call engineer in a service.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Detect
  • FM-02Record the first-alarm time in the shift log and verify aspirating detector sensitivity at each inspectionNFPA 72Improvement #2
  • FM-01Treat a rack current or temperature excursion in a customer cabinet as a call-out: go to the row, look, and escalate to the fire service on any smokeNFPA 72
  • FM-05Count damaged racks and wet floor area on the first walk-through and report to the incident commanderITIL 4
  • FM-06Log every tenant call and ticket in the first hour so unanswered queries are visibleITIL 4
  • FM-03Confirm on the panel which sprinkler zone discharged and report the zone to the incident commanderNFPA 72

No incident commander is named in the record — Owns every decision until formally relieved: site duty manager on scene, or the declared IC of a service incident.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Detect
  • FM-04Check with the fire service which suite the shutdown must cover before it is carried outNIMS / ICS
Contain
  • FM-07Freeze the origin cabinet and its power feed as evidence and log who has handled itNIMS / ICS
  • FM-02Order the row isolated and send a person to the cabinet while the alarm is still at incipient stageNFPA 76
  • FM-01Declare the incident and call the fire service at the first confirmed smoke, before the sprinkler dischargesNIMS / ICS
  • FM-05Set a re-energisation sequence by row after inspection, and publish it to tenantsNIMS / ICS
  • FM-06Assign one named communications owner and give them the remediation plan each shiftNIMS / ICS

The fire department that closed Colo 3 and Colo 4 — agency not named — External incident commander for fire, rescue and hazardous materials; works in unified command with the site.

On the record

  1. Responds and closes both suites; call time, apparatus and tactics are not publicFire department responds and closes two colocation suites (Colo 3 and Colo 4)

Playbook analyst guidance by failure mode, not a record of what happened

Contain
  • FM-03Close the sprinkler zone valve once the fire is out, to stop further water on the racksNFPA 1561
  • FM-04State which suite is involved before ordering power cut, so only the fire-origin suite is isolatedNFPA 1561

Whoever de-energised Colo 3 and Colo 4 — not named in the record — Switching, isolation and lock-out of power sources, and safe re-energisation.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-04Re-zone life-safety power shutdown so each colo suite has its own isolation pointCorrection of errors #3
Contain
  • FM-02On an early-stage alarm, de-energise the single affected row from the room PDUs before heat buildsLesson #3
  • FM-01Open the rack feed and PDU breaker of the affected cabinet before the sprinkler head tripsImprovement #5
  • FM-03Kill power to every cabinet under the discharged zone so water does not meet live equipmentContributing factor #1
  • FM-04Isolate only the suite the fire service named and hold the neighbouring suite liveImprovement #3
Recover
  • FM-04Restore the unburned suite as soon as the fire service releases it, as was done for Colo 3 after about an hourLesson #2

Digital Realty site safety and access control — not named — Head count, exclusion zones, PPE and the go / no-go for re-entry.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-02Install very-early aspirating smoke detection over each colo row and cross-zone it to suppressionImprovement #1
  • FM-01Add rack-level current and arc monitoring and thermal checks to the colo inspection roundImprovement #5
  • FM-03Replace colo-hall water sprinklers with clean-agent or double-interlock pre-action protectionCorrection of errors #2
Detect
  • FM-07Keep the detection, suppression and sprinkler test records so a maintenance chain can be confirmed or excludedImprovement #2
Contain
  • FM-05Control access to Colo 4 and issue escorted visits to tenants in batches, since the lobby filled on MondayUptime OS

Digital Realty facility teams remediating Colo 4 — not named — Restores customer service: failover, workload moves, capacity, backlog drain.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-05Pre-plan water-damage remediation and a spares pool so a wet suite does not wait on equipment replacementISO 22301
Recover
  • FM-07Commission an independent root-cause analysis and publish it to tenantsCorrection of errors #5
  • FM-01Photograph and tag the origin rack and its PDU and cabling before clean-up so the ignition source can be identifiedNFPA 1561
  • FM-05Remediate smoke and cleaning-chemical residue before power returns, then test each circuitNFPA 75
  • FM-03Dry the racks and floor and test each customer's hardware before power is returnedNFPA 75

Digital Realty customer communications — described by a tenant as silent — Status page, customer notices, regulators and press; one voice, timed updates.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-06Publish a customer incident-communication protocol with status-page updates and recovery ETAsCorrection of errors #4
Contain
  • FM-06Post the first status update within the hour naming the affected suites and the next update timeSRE incident mgmtImprovement #4
Recover
  • FM-06Send tenants a recovery ETA per suite and update it whenever it movesLesson #4
  • FM-04Tell the Colo 3 tenants when power returns and why it was cutISO 22301

El Segundo / LA County fire authority — no report located in the record — Regulator, investigator or court that establishes cause and obligations after the event.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-07Obtain the El Segundo / LA County fire department incident report and preserve evidence from the origin rackCorrection of errors #1
Recover
  • FM-02Check the alarm panel history and detector records for the night and include them in the reportCorrection of errors #1
  • FM-01Obtain the fire department report and keep the burned rack's hardware for examinationCorrection of errors #1

Colo 3 and Colo 4 tenants, including Evocative (Krypt) — The tenant or service user: their own redundancy, backups and continuity plan.

On the record

  1. A Colo 3 tenant reports the lobby packed with people waiting for Colo 4 access, a day onThe smell of smoke was intense, and the cleaning chemicals too.
  2. Evocative loses an unknown number of servers to water damageEvocative (operating as Krypt, holding former VPLS/INAP assets) loses an unknown number of servers
  3. A tenant asks the operator for status three days on and gets no recovery ETAI contacted Digital Reality and they were tight-lipped, only responding with empty words

Playbook analyst guidance by failure mode, not a record of what happened

Recover
  • FM-07Ask the operator for the origin-rack findings and review your own rack equipment against themISO 22301
  • FM-05Move critical workloads to a second site while Colo 4 has no power, rather than wait for an ETANIST SP 800-34
  • FM-06Escalate to the account manager in writing and request an ETA if none is given within a dayITIL 4
  • FM-03Power down wet servers, do not re-energise them, and book a drying and inspection with the colo operatorLesson #6

Failure mode & effects analysis (FMEA)

The fire chain in the Colo 3 and Colo 4 colocation suites at Digital Realty LAX12, El Segundo: the originating rack in Colo 4 row 4, fire detection, the water sprinkler and its effect on live IT, fire-response power shutdown across suites, recovery of Colo 4, and the operator's customer communication and root-cause disclosure. No official post-mortem exists: the record is two press accounts (DatacenterDynamics, Dgtl Infra) and a tenant's Reddit posts relayed by DCD. The ignition cause is officially undetermined, the sprinkler sub-type is not disclosed, no detection system or alarm time is named (an absence of evidence, not a confirmed absence), server losses and dollar figures are unknown, and the record is silent on injuries. Every corrective action in the dossier has 'no public evidence of remediation' or is unpublished, so no revised score is claimed: all seven modes are residual risk.

7 failure modes/0 high priority/0 of 7 with a published action/total RPN 1542 → 1542 (−0%)

RPN = S × O × D, worst first. Thin bar: after the published action.
FM-07no published action288
FM-02no published action270
FM-01no published action252
FM-05no published action252
FM-06no published action216
FM-03no published action144
FM-04no published action120
Severity × occurrence. Lines bound the medium and high zones.
1122334455667788991010Occurrence →Severity →FM-01 Equipment in a specific rack ignites at 01:40 on 21 May 2023 (S7 O4 D9); FM-05 Colo 4 stays de-energised for several days (S7 O4 D9)01, 05FM-03 The sprinkler contains the fire but discharges water onto energised servers in row 4 and adjacent rows (S6 O4 D6)03FM-02 No early (aspirating or smoke) detection or first-alarm time is on record; the first recorded response is a heat-activated sprinkler (S6 O5 D9)02FM-04 Power is cut to both Colo 3 and Colo 4, including Colo 3 which a tenant reported 'appears to be safe' (S5 O4 D6)04FM-06 The operator gives no substantive statement or recovery ETA through a multi-day outage (S4 O6 D9)06FM-07 No operator or fire-authority root-cause analysis is published and the cause stays 'undetermined' (S4 O8 D9)07
Caught only after impactD ≥ 8
5 of 7
Actions that cut occurrenceO lowered
0
Actions that cut detectionD lowered
0
Actions that cut severityblast radius unchanged
0
FM-07 No operator or fire-authority root-cause analysis is published and the cause stays 'undetermined'Root-cause investigation and disclosure 4·8·9 288 —
Function
Establish and publish the ignition source so the initiating fault can be prevented
Effect
No corrective action can target the initiating fault; this FMEA cannot score the ignition beyond 'undetermined', and maintenance history can be neither confirmed nor excluded
Cause
No RCA commissioned or disclosed; fire-department report not located
Prevention in place
None recorded
Detection in place
Visible only as the absence of a report
S 4
The missing report stops no service; it limits prevention for the operator and the industry: 'limited impact'.
O 8
The dossier records the absence as the standing state of the record.
D 9
Nothing surfaces the gap except the missing document.

Corrective action

  • Commission and disclose an independent root-cause analysis (not published as of the sources) Correction of errors #5

Who acts — playbook

Prevent
  • Authority / investigator Obtain the El Segundo / LA County fire department incident report and preserve evidence from the origin rackCorrection of errors #1
Detect
  • Safety officer Keep the detection, suppression and sprinkler test records so a maintenance chain can be confirmed or excludedImprovement #2
Contain
  • Incident commander Freeze the origin cabinet and its power feed as evidence and log who has handled itNIMS / ICS
Recover
  • Service recovery lead Commission an independent root-cause analysis and publish it to tenantsCorrection of errors #5
  • Customer Ask the operator for the origin-rack findings and review your own rack equipment against themISO 22301

Evidence

  • Metric #12Official root cause: Undetermined
  • Sequence of events #152023-05-25 (Thursday) — DataCenterDynamics (Peter Judge) publishes the only primary press account and states it has contacted Digital Realty for more information; cause remains officially 'undetermined' and no operator or fire-authority root-cause analysis is subsequently published.
  • Contributing factor #6Maintenance/inspection history not evidenced either way: no sprinkler/detection test records, hot-work permits, or deferred-inspection findings are in the public record, so a maintenance lapse can neither be confirmed nor excluded (forensic) — an evidentiary gap that itself impedes prevention.
  • Correction of errors #5Commission and disclose an independent root-cause analysis for the fire (Not published as of the sources)
FM-02 No early (aspirating or smoke) detection or first-alarm time is on record; the first recorded response is a heat-activated sprinklerFire detection in the colocation hall 6·5·9 270 —
Function
Detect an incipient rack fire before significant heat builds, in time to de-energise or knock it down
Effect
Heat and smoke had already built up in the cabinet before any response on record, ruling out an incipient-stage intervention
Cause
Detection design not evidenced in any source
Prevention in place
Unknown
Detection in place
Unknown; no alarm time is recorded
S 6
Late detection let the event progress to a sprinkler discharge, which shaped the loss within the suite; scored 6 because the outage itself is carried by FM-01.
O 5
If early detection is absent, the condition is present for any rack fire; held at 5 because its absence is not confirmed.
D 9
These scores reflect the absence of any documented early-detection control, not an observed failure of one.

Corrective action

  • Add VESDA with clean-agent suppression, or convert to double-interlock pre-action (no public evidence of remediation) Correction of errors #2
  • Very-early aspirating smoke detection cross-zoned to clean-agent suppression in live colo halls Improvement #1

Who acts — playbook

Prevent
  • Safety officer Install very-early aspirating smoke detection over each colo row and cross-zone it to suppressionImprovement #1
Detect
  • First responder Record the first-alarm time in the shift log and verify aspirating detector sensitivity at each inspectionNFPA 72Improvement #2
Contain
  • Authorised electrical person On an early-stage alarm, de-energise the single affected row from the room PDUs before heat buildsLesson #3
  • Incident commander Order the row isolated and send a person to the cabinet while the alarm is still at incipient stageNFPA 76
Recover
  • Authority / investigator Check the alarm panel history and detector records for the night and include them in the reportCorrection of errors #1

Evidence

  • Contributing factor #2“no smoke/VESDA aspirating detection system and no first-alarm time appear in any public source”
  • Sequence of events #2“the earliest recorded protection response is the heat-activated sprinkler”
  • Technical deep-dive“that is an absence of evidence, not a confirmed absence of the systems”
FM-01 Equipment in a specific rack ignites at 01:40 on 21 May 2023Customer rack in Colo 4, row 4 (originating equipment) 7·4·9 252 —
Function
Carry IT load without igniting
Effect
The fire department closes two suites; Colo 4 is out of commission for several days and an unknown number of servers is lost
Cause
Officially undetermined. No device, chemistry or failure mechanism is named; no source links the facility's UPS or batteries to the ignition
Prevention in place
None recorded
Detection in place
No rack-level monitoring or alarm is recorded before the sprinkler activated
S 7
A fire in a colocation suite that destroyed customer equipment and kept one suite dark for days exceeds the rubric's 6 for a zone-confined outage, so 7. Not 9 or 10: it was confined to one suite of one facility, the facility was not lost, and no injuries are reported (the record is silent rather than stating zero).
O 4
With the cause undetermined, the dossier gives no basis for a frequency beyond 'infrequent: needs an unusual combination'.
D 9
No control that could have seen the rack failing before ignition is recorded; the first recorded response is the heat-activated sprinkler.

Corrective action

  • In-cabinet fire detection and early suppression with rack-level current and arc monitoring Improvement #5

Who acts — playbook

Prevent
  • Safety officer Add rack-level current and arc monitoring and thermal checks to the colo inspection roundImprovement #5
Detect
  • First responder Treat a rack current or temperature excursion in a customer cabinet as a call-out: go to the row, look, and escalate to the fire service on any smokeNFPA 72
Contain
  • Authorised electrical person Open the rack feed and PDU breaker of the affected cabinet before the sprinkler head tripsImprovement #5
  • Incident commander Declare the incident and call the fire service at the first confirmed smoke, before the sprinkler dischargesNIMS / ICS
Recover
  • Authority / investigator Obtain the fire department report and keep the burned rack's hardware for examinationCorrection of errors #1
  • Service recovery lead Photograph and tag the origin rack and its PDU and cabling before clean-up so the ignition source can be identifiedNFPA 1561

Evidence

  • Reference #2 · press“The fire, which originated in a specific rack”
  • Sequence of events #12023-05-21T01:40 (local PT) — Fire breaks out in a specific equipment rack in the Colo 4 colocation suite at Digital Realty LAX12, 2260 E El Segundo Blvd, El Segundo; ignition cause undetermined. Time per an Evocative incident report cited by DCD.
  • Root cause“the exact cause of the fire remains undetermined”
  • Metric #2Fire origin location: Colo 4 suite, row 4, a specific rack
  • Contributing factor #4Undetermined ignition on the colo IT load: the fire 'originated in a specific rack' (Dgtl Infra) with no confirmed device, chemistry, or failure mode — the officially 'undetermined' cause (Dgtl Infra) means no corrective action could target the true initiating fault.
FM-05 Colo 4 stays de-energised for several daysRecovery of Colo 4 7·4·9 252 —
Function
Return the fire-origin suite to service once the fire is out
Effect
Colo 4 is still without power about three days after the fire; tenants are locked out a day later
Cause
Recovery bounded by water-damage remediation and equipment replacement rather than fire repair
Prevention in place
None recorded
Detection in place
Not applicable before the incident; recovery time was learned during it
S 7
This mode sets the length of the suite outage, several days for every tenant in Colo 4; scored 7 alongside FM-01 because duration is what lifts this event above a zone-confined outage.
O 4
Needs a fire with water discharge first: 'infrequent'.
D 9
No recovery plan or rehearsal is recorded that would have shown the multi-day recovery in advance.

Corrective action

  • None published — residual risk.

Who acts — playbook

Prevent
  • Service recovery lead Pre-plan water-damage remediation and a spares pool so a wet suite does not wait on equipment replacementISO 22301
Detect
  • First responder Count damaged racks and wet floor area on the first walk-through and report to the incident commanderITIL 4
Contain
  • Safety officer Control access to Colo 4 and issue escorted visits to tenants in batches, since the lobby filled on MondayUptime OS
  • Incident commander Set a re-energisation sequence by row after inspection, and publish it to tenantsNIMS / ICS
Recover
  • Service recovery lead Remediate smoke and cleaning-chemical residue before power returns, then test each circuitNFPA 75
  • Customer Move critical workloads to a second site while Colo 4 has no power, rather than wait for an ETANIST SP 800-34

On the record at this failure

  • Customer A Colo 3 tenant reports the lobby packed with people waiting for Colo 4 access, a day on

Evidence

  • Metric #6Colo 4 (origin) power outage: Several days (still down ~3 days later)
  • Sequence of events #14“recovery bounded by water-damage remediation and equipment replacement rather than fire repair”
  • Sequence of events #112023-05-22 (Monday) — Aftermath: a Colo 3 tenant reports the lobby 'absolutely packed with people waiting to get access to Colo 4,' conference rooms that 'looked like a battle zone,' and 'The smell of smoke was intense, and the cleaning chemicals too.' Some users still locked out a day later.
FM-06 The operator gives no substantive statement or recovery ETA through a multi-day outageCustomer incident communication 4·6·9 216 —
Function
Give affected tenants status updates and recovery ETAs during the outage
Effect
Tenants cannot plan recovery; one describes the operator as 'tight-lipped, only responding with empty words'
Cause
No incident-communication protocol is evidenced
Prevention in place
None recorded
Detection in place
Visible to customers only
S 4
It does not extend the outage; it adds business disruption for tenants: 'limited customer impact'.
O 6
Absent a protocol, the condition is present in any incident: 'occasional'. Based on one tenant's account relayed by DCD.
D 9
Only customers experience it.

Corrective action

  • Publish a customer incident-communication SLA with status-page updates and recovery ETAs (no public evidence of remediation) Correction of errors #4

Who acts — playbook

Prevent
  • Communications lead Publish a customer incident-communication protocol with status-page updates and recovery ETAsCorrection of errors #4
Detect
  • First responder Log every tenant call and ticket in the first hour so unanswered queries are visibleITIL 4
Contain
  • Communications lead Post the first status update within the hour naming the affected suites and the next update timeSRE incident mgmtImprovement #4
  • Incident commander Assign one named communications owner and give them the remediation plan each shiftNIMS / ICS
Recover
  • Communications lead Send tenants a recovery ETA per suite and update it whenever it movesLesson #4
  • Customer Escalate to the account manager in writing and request an ETA if none is given within a dayITIL 4

On the record at this failure

Evidence

  • Sequence of events #132023-05-24 (Wednesday, late) — Colo 4 still without power roughly three days after the fire; a tenant reports 'I contacted Digital Reality and they were tight-lipped, only responding with empty words' — no recovery ETA communicated.
  • Contributing factor #5“tight-lipped, only responding with empty words”
FM-03 The sprinkler contains the fire but discharges water onto energised servers in row 4 and adjacent rowsWater sprinkler over live IT in the colocation hall 6·4·6 144 —
Function
Stop fire spread without destroying the IT equipment it protects
Effect
Water damage to many servers; damage was particularly severe for Evocative (operating as Krypt), and the loss mode shifts from thermal to water
Cause
Water-based suppression over live IT; whether wet-pipe or pre-action is not disclosed
Prevention in place
Sprinkler confined the fire to row 4 with some exposure to adjacent rows
Detection in place
The discharge is evident at onset
S 6
The water drove much of the equipment loss within the suite, but the damage stayed in one zone and the suite outage is carried by FM-01: 'partial outage confined to one zone'.
O 4
Water reaches the racks whenever the sprinkler operates, but it needs a fire first: 'infrequent'.
D 6
The discharge is obvious once it starts, but nothing prevents water reaching energised IT: 'detected at onset, not prevented'.

Corrective action

  • Add VESDA with clean-agent suppression, or convert to double-interlock pre-action to keep water off live IT (no public evidence of remediation) Correction of errors #2

Who acts — playbook

Prevent
  • Safety officer Replace colo-hall water sprinklers with clean-agent or double-interlock pre-action protectionCorrection of errors #2
Detect
  • First responder Confirm on the panel which sprinkler zone discharged and report the zone to the incident commanderNFPA 72
Contain
  • Authorised electrical person Kill power to every cabinet under the discharged zone so water does not meet live equipmentContributing factor #1
  • Fire & rescue commander Close the sprinkler zone valve once the fire is out, to stop further water on the racksNFPA 1561
Recover
  • Customer Power down wet servers, do not re-energise them, and book a drying and inspection with the colo operatorLesson #6
  • Service recovery lead Dry the racks and floor and test each customer's hardware before power is returnedNFPA 75

On the record at this failure

Evidence

  • Reference #1 · press“The fire sprinkler system was activated in the Colo space above row 4 and was limited to row 4 with some exposure to adjacent rows”
  • Sequence of events #5“result[ed] in water damage to many servers”
  • Sequence of events #122023-05-22 to 2023-05-24 — Evocative (operating as Krypt, holding former VPLS/INAP assets) loses an unknown number of servers; water damage was 'particularly severe' for it.
  • Metric #10Suppression type / outcome: Water fire sprinkler (sub-type not disclosed); activated, contained fire, caused water damage
FM-04 Power is cut to both Colo 3 and Colo 4, including Colo 3 which a tenant reported 'appears to be safe'Fire-response power shutdown zoning between suites 5·4·6 120 —
Function
De-energise only the fire-origin suite during the fire response
Effect
Customers in the unburned Colo 3 lose power for about an hour
Cause
Electrical or life-safety shutdown coupling between suites (adjacency of the suites is inferred, not stated)
Prevention in place
None recorded
Detection in place
Evident at onset
S 5
About an hour of outage for tenants of a suite that did not burn: customer-visible degradation.
O 4
Needs a fire response in a neighbouring suite first: 'infrequent'.
D 6
The outage is immediate and visible, but nothing kept the second suite powered: 'detected at onset, not prevented'.

Corrective action

  • Re-zone life-safety power shutdown so an unburned neighbouring suite is not de-energised (no public evidence of remediation) Correction of errors #3

Who acts — playbook

Prevent
  • Authorised electrical person Re-zone life-safety power shutdown so each colo suite has its own isolation pointCorrection of errors #3
Detect
  • Incident commander Check with the fire service which suite the shutdown must cover before it is carried outNIMS / ICS
Contain
  • Fire & rescue commander State which suite is involved before ordering power cut, so only the fire-origin suite is isolatedNFPA 1561
  • Authorised electrical person Isolate only the suite the fire service named and hold the neighbouring suite liveImprovement #3
Recover
  • Authorised electrical person Restore the unburned suite as soon as the fire service releases it, as was done for Colo 3 after about an hourLesson #2
  • Communications lead Tell the Colo 3 tenants when power returns and why it was cutISO 22301

Evidence

  • Sequence of events #7“Power was cut off to the Colo 3 and 4 spaces”
  • Sequence of events #82023-05-21 (early AM) — De-energisation reaches the unburned Colo 3 suite — a tenant reported it 'appears to be safe' — taking down customers whose racks were never on fire; cross-suite impact beyond the fire origin (physical adjacency inferred, not stated).
  • Metric #5Colo 3 (unburned) power outage: ~1 hour ('after an hour or so')
  • Root cause“Physical adjacency of the two suites is inferred, not stated.”
Scoring rubric and method

Scales adapted from IEC 60812:2018 and AIAG-VDA. RPN = S × O × D. High: S ≥ 9 with O ≥ 4 or D ≥ 7, or RPN ≥ 300. Medium: RPN ≥ 120 or S ≥ 7. Severity overrides the product: 9 × 2 × 9 = 162 would otherwise hide a region-wide outage nothing could catch. Quotes are checked verbatim against this dossier; a revised score needs a published action. RZ analyst assessment, not an operator document.

Severity

10Hazard to people, or loss of the facility / several regions
9Region-wide or provider-wide outage of a foundational service, no workaround
8Full outage of a major service for hours
7Major degradation of a major service
6Partial outage confined to one zone or one service
5Customer-visible degradation
4Limited customer impact
3Internal impact only
2Negligible
1No effect

Occurrence

10Near certain: the cause is present in normal operation
8Frequent: routine work exercises the cause
6Occasional: a foreseeable slip or condition, weakly guarded
4Infrequent: needs an unusual combination
2Remote: guarded by design
1Eliminated by design

Detection

10No control could detect it
9Detected only through customer impact
8Detected after impact by internal monitoring
6Detected at onset, not prevented
4Detected before impact with time to act
2Automated interlock almost certainly stops it
1Certain to be stopped

Root cause and contributing factors

PROXIMATE IGNITION — OFFICIALLY UNDETERMINED. The only cause statement in the public record is negative: "Despite ongoing investigations, the exact cause of the fire remains undetermined" (Dgtl Infra). What is established is the location and load class of ignition, not the mechanism.
Full root-cause narrative
The fire began at 1:40am on Sunday 21 May 2023 in the Colo 4 colocation suite at Digital Realty's LAX12 facility, 2260 E El Segundo Blvd — it "originated in a specific rack" (Dgtl Infra), on the raised-floor IT/colo load inside a customer cabinet in (or under the sprinkler zone above) row 4, NOT in a discrete UPS room, battery room, or generator plant. No public source names the make, model, age, or battery/cell chemistry of the originating equipment, and it is not confirmed whether the first item to ignite was a server power supply, a PDU or rack whip, a cable bundle, or an in-rack battery. The facility carried 7.45 MW of UPS capacity across a two-story 132,000 sq ft building (Dgtl Infra), but no source connects that UPS/battery plant to the ignition — this is a colocation-rack IT-load fire, not a documented energy-storage event. LATENT ROOT — WATER-BASED SUPPRESSION IN A LIVE COLO HALL. The forensically significant latent factor is the fire-protection design of the colo hall: it was protected by a water sprinkler that discharged onto energised IT. The sprinkler type is NOT disclosed by any source (only "fire sprinkler system"/"sprinkler system"), so a wet-pipe vs pre-action determination cannot be made from the record — but water DID reach the racks, which drove the damage profile. As a fire-STOP the sprinkler worked: activation "above row 4... was limited to row 4 with some exposure to adjacent rows" (Digital Realty via DCD). But water is indiscriminate: the same discharge "result[ed] in water damage to many servers" (Dgtl Infra) and contributed to an "unknown number of servers" destroyed (DCD). Whether early aspirating detection plus clean-agent suppression was present is not evidenced either way — neither is named in any source — so the mitigation gap is a documented absence of evidence, not a confirmed design defect. LATENT ROOT — CROSS-SUITE DE-ENERGISATION COUPLING. Power was cut to both Colo 3 and Colo 4 when the fire department closed the halls (DCD). Colo 3, which a tenant reported "appears to be safe," still lost power (restored "after an hour or so"); Colo 4 stayed dark for several days. That the fire-response envelope forced de-energisation of a second, unburned suite points to electrical/zoning and life-safety-shutdown coupling between neighbouring colo spaces — a factor that widened the customer-impact blast radius beyond the room that actually burned. (Physical adjacency of the two suites is inferred, not stated.) MAINTENANCE / INSPECTION ROOT — NOT DETERMINABLE FROM THE RECORD. No public source implicates or exonerates any maintenance, inspection, or testing lapse. There is no hot-work or energised-work record, no deferred-inspection finding, and no sprinkler or detection test history in evidence. Because Digital Realty published no root-cause analysis and was described by a tenant as "tight-lipped," a maintenance chain can neither be confirmed nor excluded. The honest root-cause statement is therefore two-part: proximate ignition genuinely undetermined; latent contribution traceable to water-based suppression discharging on live IT and to cross-suite power-shutdown coupling.

Contributing factors by category

Contributing factors by category — Digital RealtyEquipment: Rack ignition, cause unknown. Design: Water sprinkler over live IT; No early detection on record; Suites cut together. Process: No maintenance record; No customer ETA protocol. Effect: Colo 4 out for days, servers lost.Colo 4 out for days, servers lostDesignWater sprinkler over live ITNo early detection on recordSuites cut togetherEquipmentRack ignition, cause unknownProcessNo maintenance recordNo customer ETA protocol
Each short label stands for a contributing factor or failure mode recorded in this dossier; the full sentences are listed below.
  • Fire-protection design: the colo hall was protected by a water sprinkler that discharged onto live IT — activation contained the fire but 'result[ed] in water damage to many servers' (Dgtl Infra), converting a single-rack fire into a wet loss across the row and adjacent rows (sprinkler sub-type not disclosed by sources).
  • Detection design not evidenced: no smoke/VESDA aspirating detection system and no first-alarm time appear in any public source — the only mitigation element on record is the heat-activated sprinkler, which by nature acts only after significant heat has built up, and any earlier incipient-stage response is undocumented (forensic).
  • Cross-suite power coupling: de-energisation forced by the fire response cut power to a second suite (Colo 3) as well as the fire-origin Colo 4 — 'Power was cut off to the Colo 3 and 4 spaces' (DCD) — widening customer impact beyond the room that burned; Colo 3 was reported 'safe' yet still lost power for about an hour.
  • Undetermined ignition on the colo IT load: the fire 'originated in a specific rack' (Dgtl Infra) with no confirmed device, chemistry, or failure mode — the officially 'undetermined' cause (Dgtl Infra) means no corrective action could target the true initiating fault.
  • Operator transparency/communication gap: a tenant reported Digital Realty was 'tight-lipped, only responding with empty words' (Reddit via DCD) and the operator issued no substantive public statement or published root-cause analysis, leaving affected customers without recovery ETAs during a multi-day Colo 4 outage.
  • Maintenance/inspection history not evidenced either way: no sprinkler/detection test records, hot-work permits, or deferred-inspection findings are in the public record, so a maintenance lapse can neither be confirmed nor excluded (forensic) — an evidentiary gap that itself impedes prevention.

Analysis

What burned, and what did not

This was a colocation IT-load fire, not a plant event. The fire 'originated in a specific rack' (Dgtl Infra) in Colo 4 at LAX12 (2260 E El Segundo Blvd) at 1:40am on 21 May 2023. Despite the facility's 7.45 MW UPS plant across 132,000 sq ft, no source links UPS or batteries to ignition — the origin was a customer cabinet on the raised floor, and the cause remains officially 'undetermined' (Dgtl Infra).

Suppression: a fire-stop that became a water loss

The sprinkler 'was activated in the Colo space above row 4 and was limited to row 4 with some exposure to adjacent rows' (Digital Realty via DCD) — an effective fire-stop. But it 'result[ed] in water damage to many servers' (Dgtl Infra), turning a thermal event into a hydraulic one. The sprinkler sub-type (wet-pipe vs pre-action) is not disclosed by any source, and no VESDA or clean-agent system is named — an absence of evidence, not a confirmed design defect.

Cross-suite de-energisation widened the impact

The fire department closed two suites and 'Power was cut off to the Colo 3 and 4 spaces' (DCD). Colo 3, which a tenant said 'appears to be safe,' still lost power (restored 'after an hour or so'), while Colo 4 'remained out of commission for several days' (Dgtl Infra) and was still dark ~3 days later (DCD). The shutdown envelope, not the flame, set the customer blast radius.

Communication and evidentiary gaps

A tenant found the operator 'tight-lipped, only responding with empty words' (Reddit via DCD); no operator statement or root-cause analysis was published. The fire-authority incident report, injury status, dollar loss, server count, water-flow figures, and emergency-response chronometry are all absent from the record. The forensic picture is firm on sequence and suppression class and empty on ignition mechanism — gaps that are disclosed, not filled by inference.

Technical deep-dive
This was an IT-load rack fire on a raised-floor colocation hall, not a plant-room (UPS/battery/generator) event, and the physical story turns on the water sprinkler. At 1:40am on 21 May 2023 a specific cabinet in Colo 4 at LAX12 ignited from an undetermined cause. "The fire sprinkler system was activated in the Colo space above row 4 and was limited to row 4 with some exposure to adjacent rows, according to a report from Digital Realty" (via DCD). Sprinkler heads are heat-activated at the head, so visible/energetic combustion and hot smoke had already developed in the cabinet before any water flowed. The sprinkler TYPE is not disclosed in any source — the record does not establish wet-pipe versus pre-action, and any specific head-rating or fusible-link temperature would be inference, not evidence. Likewise, no aspirating/VESDA smoke detection and no gaseous clean-agent suppression is NAMED anywhere in the record; that is an absence of evidence, not a confirmed absence of the systems. Once discharging, the sprinkler put water onto energised IT below. This is the crux of the damage mechanics: suppression stopped fire propagation but soaked the row — the discharge "result[ed] in water damage to many servers" (Dgtl Infra) — so the loss mode shifted from thermal to hydraulic. The fire department closed two colocation suites (Colo 3 and Colo 4) and "Power was cut off to the Colo 3 and 4 spaces" (DCD). Colo 3, reported by a tenant as "safe," was re-energised "after an hour or so"; Colo 4, the fire origin, "remained out of commission for several days" (Dgtl Infra) and was still without power when a tenant posted "late on Wednesday," roughly three days after the fire (DCD). Evocative — operating as Krypt and holding former VPLS/INAP assets — "lost an unknown number of servers" (DCD), with water damage "particularly severe" for it (Dgtl Infra). What the physical record does NOT contain is as important as what it does: no first-alarm time, no fire-department call/dispatch/arrival timestamps, no apparatus count, no on-scene tactics or incident-command detail, no water-flow or discharge-duration figure, no temperature reading, no confirmed server count, no dollar loss, no injury statement, and no confirmed ignition device. The El Segundo/LA County fire incident report could not be located, and the Reddit thread and any Evocative status-page report were not directly accessible. The forensic picture is firm on sequence and suppression class (a water sprinkler, activated, effective as a fire-stop, damaging as a collateral hazard) and empty on ignition mechanism, suppression sub-type, and emergency-services chronometry.

Corrective actions and lessons

Correction of errors

ActionOwnerStatus
Obtain the El Segundo/LA County Fire Department incident report and the Evocative and Digital Realty internal reports to establish the confirmed ignition source and suppression sub-typeFacility operator / fire authorityNot evidenced as done (cause remains officially undetermined)
Assess colo-hall detection/suppression: add VESDA + clean-agent or convert to double-interlock pre-action to prevent water on live ITData-center engineeringNo public evidence of remediation
Re-zone life-safety power shutdown so an unburned neighbouring suite is not de-energised with the fire-origin suiteElectrical / MEP designNo public evidence of remediation
Publish a customer incident-communication SLA with status-page updates and recovery ETAsOperator customer-success / commsNo public evidence of remediation
Commission and disclose an independent root-cause analysis for the fireDigital RealtyNot published as of the sources

Lessons learnt

  • Water as a colo suppressant is a double-edged control: the sprinkler stopped fire spread yet 'result[ed] in water damage to many servers' (Dgtl Infra) — containment success and asset destruction came from the same discharge, so suppression choice materially shapes the loss.
  • Blast radius is set by shutdown zoning, not just by flame: an unburned suite (Colo 3) still went dark because 'Power was cut off to the Colo 3 and 4 spaces' (DCD) — electrical/life-safety coupling between suites can multiply customer impact.
  • Heat-activated suppression is inherently late: with no VESDA/first-alarm evidenced, the first recorded response was a sprinkler that only trips after significant heat, foreclosing any incipient-stage de-energisation before flame (forensic).
  • Silence is an incident cost: a tenant's 'tight-lipped, only responding with empty words' (Reddit via DCD) shows that absent ETAs and status updates amplify business disruption independent of the physical damage.
  • An 'undetermined' cause with no published RCA is a prevention gap in itself: without a named initiating fault (Dgtl Infra), neither operator nor industry can close the loop on the true failure mode.
  • Concentration risk is real for managed tenants: Evocative/Krypt (former VPLS/INAP assets) took 'particularly severe' damage (Dgtl Infra), a reminder that a single suite event can disproportionately hit one customer's estate.

Improvements

  • SafetyAdd a two-stage strategy to live colo halls — very-early aspirating smoke detection (VESDA) cross-zoned to a gaseous clean-agent suppression system — so an incipient rack fire is knocked down before flashover without soaking energised IT, the exact collateral that here 'result[ed] in water damage to many servers' (Dgtl Infra). Where water sprinklers remain code-required, use double-interlock pre-action so no water sits over the racks until both heat and smoke confirm.
  • MaintenanceInstitute and retain a documented test/inspection regime for detection and suppression — periodic sprinkler flow/trip tests, VESDA sensitivity checks, and rack-level thermal/arc-fault inspections — since the public record contains no maintenance history and a lapse could be neither confirmed nor excluded (forensic).
  • DesignDecouple life-safety power shutdown between colo suites so a fire-response de-energisation of the origin suite (Colo 4) does not force an outage on a neighbour reported 'safe' (Colo 3 lost ~1 hour of power for a fire it did not have) (DCD).
  • ProcessEstablish a customer incident-communication protocol with committed status-page updates and recovery ETAs; a tenant described the operator as 'tight-lipped, only responding with empty words' (Reddit via DCD) through a multi-day Colo 4 outage, compounding business impact.
  • SafetyDeploy in-cabinet fire detection/early suppression and rack-level current/arc monitoring so a single-cabinet ignition is isolated at the rack rather than fought at the room ceiling after heat build-up.
  • ProcessCommission and disclose an independent root-cause investigation for undetermined-cause IT fires; leaving the cause 'undetermined' (Dgtl Infra) with no published RCA prevents the operator and the wider industry from targeting the true initiating fault.

References and provenance

Quotes are short, attributed, and for provenance only; the analysis is original. Last verified 2026-08-02 (seed — pending deep research).

Root access required

The DC Incidents dossier is a root-only module. Sign in with an authorized account to continue.

Back to Home