London Heatwave Cooling Failures — Google Cloud & Oracle (July 2022)
Summary
During a record UK heatwave with temperatures above 40°C, cooling systems failed at Google Cloud (europe-west2) and Oracle (UK South) London data centers, forcing hardware/VM shutdowns and regional service loss — an early climate-driven thermal event.
- Users affected
- Google Cloud europe-west2 and Oracle UK South customers
- Duration
- 14h 10m — Cooling failure 06:33 PDT 19 Jul → resolved for all affected users 20:43 PDT (~14h10).
- Financial
- Not published
- Scope
- Climate-driven cooling loss (regional)
- Site
- Google Cloud europe-west2 & Oracle UK South (London) · London, United Kingdom
- Services down
- Google Cloud europe-west2 (partial), Oracle Cloud UK South (partial)
How the defences failed
Record >40C UK heat overwhelmed cooling, forcing shutdowns at Google Cloud and Oracle London DCs — sub-scores ESTIMATED from public impact reporting, pending deep research.
All 11 impact metrics
| Record ambient outside-air temperature (UK national record) | 40.3C (104.5F) - highest ever recorded in the UK |
| Google zone affected | europe-west2-a (europe-west2-b and -c not impacted for VMs) |
| Google VMs terminated in europe-west2-a | 'a small set' (public status page); ~35% of the zone's VMs per The Register's report of Google's fuller incident report |
| Google time to 'resolved for all affected users' | ~14h10m (06:33 -> 20:43 US/Pacific, 2022-07-19) |
| Google official incident window (US/Pacific) | Began 2022-07-19 06:33, ended 2022-07-20 21:20 (~38h47m to full closure, storage tail) |
| Oracle site affected | UK South (London) - subset of cooling infrastructure |
| Fire-suppression agent discharged (gaseous/water-mist/sprinkler) | 0 - none activated (no fire occurred) |
| Personnel evacuated | 0 - no evacuation reported (equipment-protection shutdown, not life-safety) |
| Emergency-services / fire-brigade calls and arrivals | 0 - none reported |
| Lingering storage damage (Google) | Small percentage of replicated Persistent Disks in single-redundant mode; small number of HDD-backed PD volumes exhibiting IO errors |
| Operators impacted by the same heat event (same day) | 2 - Google (europe-west2-a) and Oracle (UK South) |
Sequence of events
- TRIGGER UK ambient air reaches an all-time national record of 40.3C (104.5F); London experiences its first-ever day above 40C, driving cooling units toward their design limits.
- TRIGGER Google incident begins: a cooling-related failure in one building hosting zone europe-west2-a; The Register (2022-08-01) reported this as a simultaneous failure of multiple redundant cooling systems under record ambient.
- DETECTION Data-centre environmental/BMS temperature monitoring (NOT fire/smoke detection - no combustion) registers loss of cooling; the building could not maintain a safe operating temperature. No fire alarm - a thermal, not fire, condition.
- MITIGATION Protective thermal load-shed (de-energisation analogue): Google powers down part of the zone and limits preemptible launches to prevent machine damage. NO fire suppression discharged - no gaseous/water-mist/sprinkler activation, because there was no fire.Operations lead
- IMPACT Compute Engine terminates VMs in the impacted datacenter - a small set per the public status page; ~35% of europe-west2-a VMs per The Register's report of Google's fuller incident report.
- CASCADE Recovery-procedure error widens blast radius: engineers inadvertently modify traffic routing for internal services to avoid all three europe-west2 zones rather than just the impacted europe-west2-a.Operations lead
- DETECTION Google publicly acknowledges the fault: 'There has been a cooling-related failure in one of our buildings that hosts zone europe-west2-a for region europe-west2.'Communications lead
- TRIGGER Oracle UK South (London): a subset of cooling infrastructure experiences an issue as a result of unseasonal temperatures - a second, independent London campus hit by the same heat event.
- DETECTION Oracle acknowledges the cooling problem at its UK South (London) data centre.Communications lead
- MITIGATION Oracle protective power-down: identifying 'service infrastructure that can be safely powered down to prevent additional hardware failures' - thermal load-shed, not fire response.Operations lead
- IMPACT NEGATIVE FORENSICS - no personnel evacuation reported (equipment-protection shutdown, not a life-safety event) and no emergency-services / fire-brigade call or arrival is reported; response was operator engineering teams restoring cooling and rebuilding capacity.Service recovery lead
- RECOVERY Google cooling reported restored (~14:13 US/Pacific per The Register 2022-08-01) and capacity rebuild begins in europe-west2-a.
- RESTORED Google: 'the issue has been resolved for all affected users as of Tuesday, 2022-07-19 20:43 US/Pacific' (~14h10m from 06:33 start), though some storage issues persist requiring support contact.
- IMPACT Storage long-tail: a small number of HDD-backed Persistent Disk volumes still exhibit IO errors, with a small percentage of replicated PDs running in single-redundant mode - genuine media damage from the thermal event/abrupt power-down.
- RECOVERY Oracle data-centre cooling infrastructure reported restored and temperatures returned to normal operating levels.
- RESTORED Google official incident window closes. Status-page window: began 2022-07-19 06:33, ended 2022-07-20 21:20 US/Pacific (~38h47m to full closure); the extra tail beyond the 20:43 Jul 19 'resolved for all users' mark was storage remediation.
Response by role
What each role did
Roles the sequence of events shows acting; every entry quotes its source line. Select a time to jump to it.
Role by role
Recorded actions / playbook actions per role. A role with 0 recorded actions does not appear in the sources.
No on-call responder is named; BMS temperature monitoring raised the alarm — Meets the first alarm: on-shift technician or security in a facility, on-call engineer in a service.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-05Watch traffic per zone after any routing change and alert if healthy zones lose loadSRE incident mgmt
- FM-02Alarm when two or more cooling units drop or derate together; treat it as a shared driverASHRAE TC 9.9
- FM-04Monitor disk IO errors and replica count after a power-down and page storage on any dropSRE incident mgmt
- FM-01Page facilities on BMS hall-temperature trend and on cooling units nearing rated limit, ahead of the high-temperature alarmASHRAE TC 9.9
- FM-03Alert the Compute Engine owners the moment a zone power-down is chosen, with the list of VMsSRE incident mgmt
- FM-06Raise a cooling alert to the on-call as soon as temperatures leave band, before customers see errorsASHRAE TC 9.9
No incident commander is named in the record — Owns every decision until formally relieved: site duty manager on scene, or the declared IC of a service incident.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-07Agree before an incident what plant and test facts will be published afterwardsISO 22301
- FM-05Revert the routing change at once and re-apply it scoped to the affected zoneSRE incident mgmt
- FM-02Declare a thermal incident at the first second unit lost, before the hall cannot hold temperatureSRE incident mgmt
- FM-01Start staged workload drain in the hottest hall before hardware limits, using the pre-agreed load-shed orderSRE incident mgmt
Operator facilities engineers restoring cooling — not individually named — Chillers, CRAH/CRAC, pumps, cooling towers and the thermal envelope of the white space.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-02Function-test standby cooling units under near-design high ambient and log the resultASHRAE TC 9.9Improvement #3
- FM-02Audit the plant for common-mode paths so duplicated units cannot all be defeated by one driver such as ambient heatASHRAE TC 9.9Improvement #2
- FM-01Raise the cooling plant's worst-case design ambient and factory-test the units to itASHRAE TC 9.9Improvement #1
- FM-06Test Oracle's standby cooling at near-design ambient and publish the climate envelopeASHRAE TC 9.9Correction of errors #3
- FM-01Restore cooling capacity unit by unit and confirm hall temperature before releasing loadASHRAE TC 9.9
Google and Oracle engineers who powered down infrastructure and changed routing — Technical lead who diagnoses and drives the fix; the subject-matter expert at the keyboard or the switchboard.
On the record
- Powers down part of europe-west2-a and limits preemptible launches to prevent machine damage
Google powers down part of the zone and limits preemptible launches
- Reroute internal-service traffic away from all three europe-west2 zones rather than only zone a
engineers inadvertently modify traffic routing for internal services
- Oracle identifies and powers down infrastructure that can be safely shut off
service infrastructure that can be safely powered down to prevent additional hardware failures
Playbook analyst guidance by failure mode, not a record of what happened
- FM-05Require a second engineer to confirm the target zone before routing changes in an incidentChange management
- FM-03Write a staged thermal load-shed runbook: migrate or drain workloads before VMs are terminatedUptime OSImprovement #4
- FM-03Validate BMS high-temperature thresholds and shutdown setpoints so there is time to migrateASHRAE TC 9.9Improvement #4
- FM-04Hold the all-clear for the zone until storage health is checked, not only computeITIL 4
- FM-01Power down the part of the zone that cannot be held and limit new preemptible launches into itSRE incident mgmt
- FM-03Terminate the lowest-priority VMs first and keep the rest running while the heat load fallsSRE incident mgmt
- FM-06Identify service infrastructure that can be powered down safely and shut it down to prevent hardware failureASHRAE TC 9.9
Operator engineering teams rebuilding capacity — not individually named — Restores customer service: failover, workload moves, capacity, backlog drain.
On the record
- Operator engineering teams restore cooling and rebuild capacity; no evacuation or fire call occurs
operator engineering teams restoring cooling and rebuilding capacity
Playbook analyst guidance by failure mode, not a record of what happened
- FM-04Harden Persistent Disk so an emergency power-down cannot leave replicas single-redundantImprovement #6
- FM-05Confirm internal services are serving in the two healthy zones before closingITIL 4
- FM-07Publish plant and maintenance-test history after the event for independent learningLesson #6
- FM-02Rebuild capacity in the zone and verify each hall before moving workloads backITIL 4
- FM-04Restore Persistent Disk redundancy and remediate HDD-backed volumes with IO errorsCorrection of errors #4
- FM-03Restart the terminated VMs in the zone once cooling is restored, in customer priority orderITIL 4
- FM-06Restore Oracle Integration Cloud and the remaining impacted subset after cooling is backITIL 4
Google Cloud Service Health and the Oracle status channel — Status page, customer notices, regulators and press; one voice, timed updates.
On the record
- Posts a cooling-related failure notice about 2.5 hours after the 06:33 PDT start
Google publicly acknowledges the fault
- Acknowledges the cooling problem at 16:38 UTC
Oracle acknowledges the cooling problem at its UK South (London) data centre
Playbook analyst guidance by failure mode, not a record of what happened
- FM-04Tell affected customers to contact support and name which disks remain at riskITIL 4
Google SRE and networking, owners of the routing tooling — Authored or approved the change, deployment or configuration push that started the event.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-05Add a scope guard so a zone-scoped traffic mitigation cannot be applied to all zonesImprovement #5
Cloud customers hosted in europe-west2 and Oracle UK South — The tenant or service user: their own redundancy, backups and continuity plan.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
Failure mode & effects analysis (FMEA)
The cooling and thermal-protection chain at two London cloud campuses on the UK's 40.3C record day: Google's building hosting europe-west2-a (cooling-plant design margin, redundant cooling units, protective thermal load-shed, Persistent Disk durability under abrupt power-down, and the traffic-routing mitigation that widened the impact) and Oracle's UK South data centre, plus the disclosure record. This was a thermal event, not a fire: no combustion, suppression, evacuation or emergency-services response is reported. Google's public status page confirms only 'a cooling related failure', 'a small set' of VM terminations and the storage tail; the simultaneous failure of redundant units, the ~35% VM figure and the zone-wide routing error come from The Register's account of Google's fuller report, and the 'above design limits' framing is trade analysis that the operators did not confirm. Oracle's account is a status note with no equipment detail. No corrective action in the dossier is stated as done or committed by either operator, so every mode is shown as residual risk.
- Caught only after impactD ≥ 8
- 4 of 7
- Actions that cut occurrenceO lowered
- 0
- Actions that cut detectionD lowered
- 0
- Actions that cut severityblast radius unchanged
- 0
FM-05 Engineers inadvertently reroute internal-service traffic away from all three europe-west2 zones instead of europe-west2-a aloneTraffic-routing mitigation tooling for internal services 7·6·8 336 —
- Function
- Steer internal-service traffic away from the impacted zone only
- Effect
- Customer impact widens beyond the physically affected zone to the region
- Cause
- No guardrail stopping a zone-scoped mitigation from being applied region-wide (reported by The Register; not on the public status page)
- Prevention in place
- None recorded
- Detection in place
- None recorded before impact
- S 7
- Region-level degradation of internal services caused by the response rather than the plant: 'major degradation of a major service'. Not 8 because VMs in -b and -c kept running.
- O 6
- A manual mitigation applied under pressure with no recorded scope guard is a foreseeable slip, weakly guarded: 'occasional'.
- D 8
- No check is recorded that caught the wider scope before it took effect: 'detected after impact'.
Corrective action
- Guardrails so zone-scoped traffic-routing mitigations cannot be applied region-wide (identified in Google's report per The Register; public commitment not independently confirmed) Correction of errors #2
- Blast-radius containment in routing and failover tooling (analyst recommendation) Improvement #5
Who acts — playbook
- Change owner Add a scope guard so a zone-scoped traffic mitigation cannot be applied to all zonesImprovement #5
- Operations lead Require a second engineer to confirm the target zone before routing changes in an incidentChange management
- First responder Watch traffic per zone after any routing change and alert if healthy zones lose loadSRE incident mgmt
- Incident commander Revert the routing change at once and re-apply it scoped to the affected zoneSRE incident mgmt
- Service recovery lead Confirm internal services are serving in the two healthy zones before closingITIL 4
On the record at this failure
- Operations lead Reroute internal-service traffic away from all three europe-west2 zones rather than only zone a
Evidence
- Sequence of events #62022-07-19 — Recovery-procedure error widens blast radius: engineers inadvertently modify traffic routing for internal services to avoid all three europe-west2 zones rather than just the impacted europe-west2-a.
- Contributing factor #4SELF-ADMITTED OPERATIONAL / RECOVERY-PROCEDURE ERROR: Engineers inadvertently modified traffic routing for internal services to avoid all three europe-west2 zones rather than just the impacted europe-west2-a, enlarging the blast radius beyond the physically affected zone (The Register, 2022-08-01; not on public status page).
- Technical deep-dive“engineers inadvertently modified traffic routing for internal services to avoid all three europe-west2 zones rather than just europe-west2-a”
FM-07 Neither operator releases equipment make, model, age, refrigerant, plant type or maintenance/test historyPost-incident disclosure 3·8·9 216 —
- Function
- Publish plant type, equipment and test history so customers and the industry can judge the residual risk
- Effect
- Whether the plant was economiser or mechanical, and whether redundant units were ever tested at high ambient, stays unknown; the design-limit cause cannot be verified
- Cause
- Operators did not publish; disclosure gap recorded as not done
- Prevention in place
- None recorded
- Detection in place
- Visible only as the absence of a record
- S 3
- Limits learning and verification rather than any running service: closest to 'internal impact only'.
- O 8
- Every equipment and test detail is missing for both operators, so the gap is the routine state of the record: 'frequent'.
- D 9
- Nothing surfaces it except its absence.
Corrective action
- Publish equipment/plant type and maintenance-test history (Google & Oracle; status: not done) Correction of errors #5
Who acts — playbook
- Customer Ask the operator for plant type, redundancy and high-ambient test results as part of resilience reviewCorrection of errors #5
- Incident commander Agree before an incident what plant and test facts will be published afterwardsISO 22301
- Customer Treat a single zone or building as a failure domain and test multi-zone failoverISO 22301Improvement #7
- Communications lead State what is confirmed and what is reported only, so customers do not rely on the larger figuresITIL 4
- Service recovery lead Publish plant and maintenance-test history after the event for independent learningLesson #6
Evidence
- Correction of errors #5Publish equipment/plant type and maintenance-test history to enable independent post-incident learning (Not done - disclosure gap)
- Technical deep-dive“No equipment make/model/age/refrigerant chemistry was released for either operator”
- Root cause“were NOT disclosed by either operator for either site”
FM-02 Multiple redundant cooling systems fail simultaneously, so the redundancy does not deliver (attributed to Google's fuller report via The Register)Redundant cooling units, europe-west2-a building 5·4·8 160 —
- Function
- Carry the cooling load when a duty unit fails
- Effect
- No standby capacity is left to hold the hall temperature, so the zone power-down in FM-01 follows
- Cause
- A common-mode driver (the shared record ambient) or a single point of failure; whether the units had ever been function-tested under near-design high ambient is unknown
- Prevention in place
- N+1/N+2-style duplication of identical units
- Detection in place
- None recorded before the event; no test-under-load record is published
- S 5
- This mode is why FM-01's capacity loss became a zone outage; scored one step below FM-01 so the same outage is not counted twice at full weight.
- O 4
- Common-mode failure of duplicated units needs the shared extreme driver: 'infrequent'. The simultaneity is attributed reporting, not on Google's public page.
- D 8
- No high-ambient function test is recorded, so the common-mode weakness was found only when the units failed together, after impact.
Corrective action
- Function-test redundant cooling units under near-design high ambient (Google & Oracle; not evidenced in any public source) Correction of errors #3
- Audit plant for common-mode paths and add diverse cooling paths (analyst recommendation) Improvement #2
Who acts — playbook
- Mechanical / cooling engineer Function-test standby cooling units under near-design high ambient and log the resultASHRAE TC 9.9Improvement #3
- Mechanical / cooling engineer Audit the plant for common-mode paths so duplicated units cannot all be defeated by one driver such as ambient heatASHRAE TC 9.9Improvement #2
- First responder Alarm when two or more cooling units drop or derate together; treat it as a shared driverASHRAE TC 9.9
- Incident commander Declare a thermal incident at the first second unit lost, before the hall cannot hold temperatureSRE incident mgmt
- Service recovery lead Rebuild capacity in the zone and verify each hall before moving workloads backITIL 4
Evidence
- Contributing factor #3REDUNDANCY THAT DID NOT DELIVER (suspected common-mode / single point of failure): Google's fuller report (via The Register, 2022-08-01) described a simultaneous failure of multiple redundant cooling systems; simultaneity of 'redundant' units implies a shared driver (record ambient) or single point of failure rather than independent random failure.
- Contributing factor #5NO MAINTENANCE/INSPECTION LAPSE EVIDENCED, BUT TEST-UNDER-LOAD UNVERIFIED: No source attributes the failure to deferred maintenance or a botched service; however, the record is silent on whether the redundant units had ever been function-tested under near-design high ambient - an unverified resilience gap (disclosed uncertainty).
- Root cause“the record is silent on whether the redundant units had ever been function-tested under near-design ambient”
- Technical deep-dive“implying a common-mode driver or single point of failure so that intended redundancy did not deliver”
FM-04 The abrupt power-down leaves replicated Persistent Disks in single-redundant mode and HDD-backed volumes with IO errorsPersistent Disk under abrupt de-energisation 5·4·8 160 —
- Function
- Keep replicated and HDD-backed volumes intact and fully redundant through an emergency power-down
- Effect
- Storage impact persists after the 'resolved for all users' mark and stretches the official incident window to ~38h47m
- Cause
- Media damage from the thermal event and the abrupt power-down
- Prevention in place
- Replication of Persistent Disk devices
- Detection in place
- Internal monitoring; reported in later status-page updates
- S 5
- A small number of volumes with IO errors and reduced redundancy: customer-visible degradation, not a zone outage.
- O 4
- Follows only from an emergency power-down of the zone: 'infrequent'.
- D 8
- Found after impact by Google's own monitoring and reported through the status page.
Corrective action
- Restore Persistent Disk redundancy and remediate HDD-backed volumes with IO errors (in progress at report time; repairs the damage rather than preventing it) Correction of errors #4
- Harden Persistent Disk against abrupt de-energisation (analyst recommendation) Improvement #6
Who acts — playbook
- Service recovery lead Harden Persistent Disk so an emergency power-down cannot leave replicas single-redundantImprovement #6
- First responder Monitor disk IO errors and replica count after a power-down and page storage on any dropSRE incident mgmt
- Operations lead Hold the all-clear for the zone until storage health is checked, not only computeITIL 4
- Service recovery lead Restore Persistent Disk redundancy and remediate HDD-backed volumes with IO errorsCorrection of errors #4
- Communications lead Tell affected customers to contact support and name which disks remain at riskITIL 4
Evidence
- Sequence of events #142022-07-20 (recovery update) — Storage long-tail: a small number of HDD-backed Persistent Disk volumes still exhibit IO errors, with a small percentage of replicated PDs running in single-redundant mode - genuine media damage from the thermal event/abrupt power-down.
- Metric #10Lingering storage damage (Google): Small percentage of replicated Persistent Disks in single-redundant mode; small number of HDD-backed PD volumes exhibiting IO errors
- Contributing factor #7ABRUPT DE-ENERGISATION AS A DAMAGE SOURCE: The protective emergency power-down itself contributed to lasting harm - replicated Persistent Disks left in single-redundant mode and HDD-backed volumes exhibiting IO errors (Google status page, 2022-07-19/20).
- Metric #5Google official incident window (US/Pacific): Began 2022-07-19 06:33, ended 2022-07-20 21:20 (~38h47m to full closure, storage tail)
- Reference #1 · vendor-status“running in single redundant mode”
FM-01 Cooling capacity collapses on a 40.3C day and the building cannot maintain a safe operating temperatureGoogle cooling plant, building hosting europe-west2-a (design ambient margin) 6·4·6 144 —
- Function
- Hold a safe hall temperature at the highest outside-air temperature the site will see
- Effect
- Google powers down part of europe-west2-a and limits preemptible launches; Compute Engine terminates VMs in the zone; resolved for all users after ~14h10m
- Cause
- Record ambient pushing the units toward or above their rated design limits; trade reporting frames this as a design-margin gap, not operator-confirmed. Plant type, make and age are undisclosed
- Prevention in place
- Cooling plant sized to a worst-case design ambient that the dossier says appears to have been set below 40C
- Detection in place
- Environmental/BMS temperature monitoring registered the loss of cooling
- S 6
- Partial outage confined to one zone: europe-west2-b and -c were not impacted for VMs. Not higher because the region's other zones kept serving VMs; the region-wide widening is scored in FM-05.
- O 4
- Needed an unusual combination, the first day above 40C ever recorded in London: 'infrequent'. The dossier's lessons argue this ambient is now design-relevant, so it is not scored as remote.
- D 6
- Temperature monitoring saw the loss at onset and the load-shed followed, but nothing stopped the hall overheating: 'detected at onset, not prevented'.
Corrective action
- Raise the cooling-plant worst-case design ambient and factory-test to it (inferred remediation; not publicly confirmed by the operator) Correction of errors #1
- Design head-room so cooling keeps capacity on 40C+ days (analyst recommendation) Improvement #1
Who acts — playbook
- Mechanical / cooling engineer Raise the cooling plant's worst-case design ambient and factory-test the units to itASHRAE TC 9.9Improvement #1
- First responder Page facilities on BMS hall-temperature trend and on cooling units nearing rated limit, ahead of the high-temperature alarmASHRAE TC 9.9
- Incident commander Start staged workload drain in the hottest hall before hardware limits, using the pre-agreed load-shed orderSRE incident mgmt
- Operations lead Power down the part of the zone that cannot be held and limit new preemptible launches into itSRE incident mgmt
- Mechanical / cooling engineer Restore cooling capacity unit by unit and confirm hall temperature before releasing loadASHRAE TC 9.9
Evidence
- Sequence of events #12022-07-19 (daytime, UK) — UK ambient air reaches an all-time national record of 40.3C (104.5F); London experiences its first-ever day above 40C, driving cooling units toward their design limits.
- Sequence of events #22022-07-19 06:33 US/Pacific (13:33 UTC) — Google incident begins: a cooling-related failure in one building hosting zone europe-west2-a; The Register (2022-08-01) reported this as a simultaneous failure of multiple redundant cooling systems under record ambient.
- Metric #1Record ambient outside-air temperature (UK national record): 40.3C (104.5F) - highest ever recorded in the UK
- Metric #2Google zone affected: europe-west2-a (europe-west2-b and -c not impacted for VMs)
- Contributing factor #2DESIGN-MARGIN / WORST-CASE ENVELOPE SET TOO LOW: The plant appears to have lacked head-room for a 40C day; trade analysis contrasts operators that design and factory-test cooling 'for worst-case conditions' with the failed London plant, implying its worst-case design temperature trailed the emerging climate reality (The Register, 2022-08-22, trade analysis - not operator-confirmed).
- Root cause“they are inference/analysis, not operator-disclosed fact”
FM-03 The protective power-down terminates VMs abruptly rather than draining or migrating themProtective thermal load-shed (zone power-down) 6·4·6 144 —
- Function
- Shed load to protect hardware while limiting the harm to running workloads
- Effect
- VMs in the impacted datacenter are terminated: 'a small set' per the public status page, ~35% of the zone per The Register
- Cause
- No staged load-shed runbook is recorded; the power-down was taken to prevent machine damage
- Prevention in place
- Load-shed itself prevented uncontrolled hardware damage
- Detection in place
- Known at the moment it was taken
- S 6
- VM terminations confined to one zone: 'partial outage confined to one zone'. The two sources disagree on scale ('small set' against ~35%), so the score is not raised on the larger figure.
- O 4
- Needed only when cooling is lost at this scale, which is infrequent.
- D 6
- The operator chose and saw the shutdown as it happened; nothing in the record bought time for migration: 'detected at onset, not prevented'.
Corrective action
- Graceful, staged thermal load-shed runbook that drains workloads before hard termination (analyst recommendation) Improvement #4
Who acts — playbook
- Operations lead Write a staged thermal load-shed runbook: migrate or drain workloads before VMs are terminatedUptime OSImprovement #4
- Operations lead Validate BMS high-temperature thresholds and shutdown setpoints so there is time to migrateASHRAE TC 9.9Improvement #4
- First responder Alert the Compute Engine owners the moment a zone power-down is chosen, with the list of VMsSRE incident mgmt
- Operations lead Terminate the lowest-priority VMs first and keep the rest running while the heat load fallsSRE incident mgmt
- Service recovery lead Restart the terminated VMs in the zone once cooling is restored, in customer priority orderITIL 4
On the record at this failure
- Operations lead Powers down part of europe-west2-a and limits preemptible launches to prevent machine damage
Evidence
- Sequence of events #42022-07-19 (immediately after detection) — Protective thermal load-shed (de-energisation analogue): Google powers down part of the zone and limits preemptible launches to prevent machine damage. NO fire suppression discharged - no gaseous/water-mist/sprinkler activation, because there was no fire.
- Sequence of events #52022-07-19 — Compute Engine terminates VMs in the impacted datacenter - a small set per the public status page; ~35% of europe-west2-a VMs per The Register's report of Google's fuller incident report.
- Metric #3Google VMs terminated in europe-west2-a: 'a small set' (public status page); ~35% of the zone's VMs per The Register's report of Google's fuller incident report
FM-06 A subset of cooling infrastructure fails under unseasonal temperaturesOracle UK South (London) cooling infrastructure 6·4·6 144 —
- Function
- Hold safe operating temperature at the UK South data centre during the heatwave
- Effect
- Oracle powers down service infrastructure that can be safely powered down to prevent further hardware failures; a subset of Oracle Integration Cloud stays impacted after cooling is restored
- Cause
- Unseasonal temperatures; Oracle named no equipment, age, refrigerant or maintenance history
- Prevention in place
- None recorded
- Detection in place
- Oracle acknowledged the cooling problem at 16:38 UTC
- S 6
- Partial loss of service at one site, scored like Google's zone: 'partial outage confined to one zone or one service'. The scale is not quantified.
- O 4
- The same record-ambient combination as FM-01: 'infrequent'. Two operators failing on the same day suggests a shared design assumption, which keeps it from being scored as remote.
- D 6
- The issue was recognised and a protective power-down taken, but not prevented: 'detected at onset, not prevented'.
Corrective action
- Function-test redundant cooling under near-design high ambient (Google & Oracle; not evidenced in any public source) Correction of errors #3
Who acts — playbook
- Mechanical / cooling engineer Test Oracle's standby cooling at near-design ambient and publish the climate envelopeASHRAE TC 9.9Correction of errors #3
- First responder Raise a cooling alert to the on-call as soon as temperatures leave band, before customers see errorsASHRAE TC 9.9
- Operations lead Identify service infrastructure that can be powered down safely and shut it down to prevent hardware failureASHRAE TC 9.9
- Communications lead Post status early to customers rather than after an hour; name the data centre and services affectedITIL 4
- Service recovery lead Restore Oracle Integration Cloud and the remaining impacted subset after cooling is backITIL 4
On the record at this failure
Evidence
- Sequence of events #82022-07-19 (UK afternoon) — Oracle UK South (London): a subset of cooling infrastructure experiences an issue as a result of unseasonal temperatures - a second, independent London campus hit by the same heat event.
- Sequence of events #102022-07-19 (after acknowledgement) — Oracle protective power-down: identifying 'service infrastructure that can be safely powered down to prevent additional hardware failures' - thermal load-shed, not fire response.
- Sequence of events #152022-07-20 ~03:57 UTC (per The Register follow-up) — Oracle data-centre cooling infrastructure reported restored and temperatures returned to normal operating levels.
- Contributing factor #6SIMULTANEOUS TWO-OPERATOR EXPOSURE: Both Google (europe-west2-a) and Oracle (UK South) cooling plant failed the same day under the same heat event, indicating a regional/industry design-assumption gap rather than a single-site defect (The Register, 2022-07-19).
- Reference #2 · press“a subset of cooling infrastructure within the UK South (London) Data Centre has experienced an issue”
Scoring rubric and method
Scales adapted from IEC 60812:2018 and AIAG-VDA. RPN = S × O × D. High: S ≥ 9 with O ≥ 4 or D ≥ 7, or RPN ≥ 300. Medium: RPN ≥ 120 or S ≥ 7. Severity overrides the product: 9 × 2 × 9 = 162 would otherwise hide a region-wide outage nothing could catch. Quotes are checked verbatim against this dossier; a revised score needs a published action. RZ analyst assessment, not an operator document.
Severity
| 10 | Hazard to people, or loss of the facility / several regions |
| 9 | Region-wide or provider-wide outage of a foundational service, no workaround |
| 8 | Full outage of a major service for hours |
| 7 | Major degradation of a major service |
| 6 | Partial outage confined to one zone or one service |
| 5 | Customer-visible degradation |
| 4 | Limited customer impact |
| 3 | Internal impact only |
| 2 | Negligible |
| 1 | No effect |
Occurrence
| 10 | Near certain: the cause is present in normal operation |
| 8 | Frequent: routine work exercises the cause |
| 6 | Occasional: a foreseeable slip or condition, weakly guarded |
| 4 | Infrequent: needs an unusual combination |
| 2 | Remote: guarded by design |
| 1 | Eliminated by design |
Detection
| 10 | No control could detect it |
| 9 | Detected only through customer impact |
| 8 | Detected after impact by internal monitoring |
| 6 | Detected at onset, not prevented |
| 4 | Detected before impact with time to act |
| 2 | Automated interlock almost certainly stops it |
| 1 | Certain to be stopped |
Root cause and contributing factors
Full root-cause narrative
Contributing factors by category
- RECORD AMBIENT / CLIMATE FORCING: The UK hit an all-time record 40.3C (104.5F) on 2022-07-19 - London's first day ever above 40C - pushing cooling units to and beyond their rated design envelope (The Register, 2022-07-19; design-limit framing via Tech Monitor/The Register, 2022-08-22, attributed-not-re-verified).
- DESIGN-MARGIN / WORST-CASE ENVELOPE SET TOO LOW: The plant appears to have lacked head-room for a 40C day; trade analysis contrasts operators that design and factory-test cooling 'for worst-case conditions' with the failed London plant, implying its worst-case design temperature trailed the emerging climate reality (The Register, 2022-08-22, trade analysis - not operator-confirmed).
- REDUNDANCY THAT DID NOT DELIVER (suspected common-mode / single point of failure): Google's fuller report (via The Register, 2022-08-01) described a simultaneous failure of multiple redundant cooling systems; simultaneity of 'redundant' units implies a shared driver (record ambient) or single point of failure rather than independent random failure.
- SELF-ADMITTED OPERATIONAL / RECOVERY-PROCEDURE ERROR: Engineers inadvertently modified traffic routing for internal services to avoid all three europe-west2 zones rather than just the impacted europe-west2-a, enlarging the blast radius beyond the physically affected zone (The Register, 2022-08-01; not on public status page).
- NO MAINTENANCE/INSPECTION LAPSE EVIDENCED, BUT TEST-UNDER-LOAD UNVERIFIED: No source attributes the failure to deferred maintenance or a botched service; however, the record is silent on whether the redundant units had ever been function-tested under near-design high ambient - an unverified resilience gap (disclosed uncertainty).
- SIMULTANEOUS TWO-OPERATOR EXPOSURE: Both Google (europe-west2-a) and Oracle (UK South) cooling plant failed the same day under the same heat event, indicating a regional/industry design-assumption gap rather than a single-site defect (The Register, 2022-07-19).
- ABRUPT DE-ENERGISATION AS A DAMAGE SOURCE: The protective emergency power-down itself contributed to lasting harm - replicated Persistent Disks left in single-redundant mode and HDD-backed volumes exhibiting IO errors (Google status page, 2022-07-19/20).
Analysis
What actually happened - and what did not
On 2022-07-19, the UK's hottest day on record (40.3C), cooling failed at two independent London cloud campuses - Google's europe-west2-a and Oracle's UK South. This was a thermal cooling-capacity collapse, not a fire. There was no ignition, no combustion, no smoke/heat detection, no suppression discharge, no evacuation, and no emergency-services response reported by any source. The correct analogues are environmental/BMS temperature monitoring in place of fire detection, and deliberate thermal load-shedding / de-energisation in place of fire suppression. Google confirmed 'a cooling related failure in one of our buildings that hosts zone europe-west2-a', and 'powered down part of the zone' to prevent machine damage.
The latent root: design margin versus a changing climate
The units were, per trade reporting, 'required to operate above their design limits' - a design-margin gap rather than a maintenance failure. The plant's worst-case ambient envelope appears to have been set below the emerging UK climate reality; London had never before exceeded 40C. This reframes the event from an equipment fault to a climate-resilience shortfall: cooling designed and factory-tested for historical worst-case conditions is now under-provisioned. (The 'above design limits' framing is trade analysis via Tech Monitor/The Register and was not operator-confirmed or re-verified this pass.)
Redundancy that did not deliver
Google's fuller report (via The Register, 2022-08-01) described a simultaneous failure of multiple redundant cooling systems. Simultaneity among 'redundant' units is the tell of a common-mode driver - here the shared record ambient - or a single point of failure. Genuine N+1/N+2 redundancy should not permit backup-capable units to fail together; that they did indicates the redundancy was duplicated rather than diverse and independent. This is the single most important engineering lesson of the event.
Self-inflicted blast radius: the failover-tooling error
The physical impact was confined to one building/hall of europe-west2-a (europe-west2-b and -c were explicitly unaffected for VMs). The damaging secondary spread was operational: engineers inadvertently rerouted internal-service traffic away from all three europe-west2 zones rather than just the impacted one, widening customer impact. This procedural error - not the cooling failure - drove much of the customer-visible blast radius, underscoring recovery-tooling discipline. (Reported by The Register; not on the public status page.)
Storage long-tail and the cost of emergency shutdown
Protective de-energisation is not free. Google's status page confirms 'a small percentage of replicated Persistent Disk devices are now running in single redundant mode' and 'a small number of HDD backed Persistent Disk volumes are still experiencing impact and will exhibit IO errors.' The abrupt power-down inflicted genuine storage-media damage and left durability degraded, extending the official incident window (06:33 Jul 19 to 21:20 Jul 20 US/Pacific) well past the 'resolved for all users' mark at 20:43 Jul 19.
Two operators, one heat event, and the disclosure gap
Both Google and Oracle cooling plant failed the same day under the same heat - a sector-level design-assumption signal, not a one-off. Yet disclosure was thin: neither operator released equipment make/model/age, refrigerant chemistry, plant type (free-cooling economiser vs mechanical DX/chilled-water), maintenance/test history, MW lost, rack counts, or cost. No maintenance or inspection lapse is evidenced anywhere; equally, whether the redundant units had ever been function-tested under near-design ambient is unknown. These remain disclosed-uncertainty points, not findings.
Technical deep-dive
Corrective actions and lessons
Correction of errors
| Action | Owner | Status |
|---|---|---|
| Raise cooling-plant worst-case design ambient and factory-test to it (climate-resilience uplift for UK/comparable sites) | Google DC facilities / engineering | Inferred remediation - not publicly confirmed by operator |
| Add guardrails so zone-scoped traffic-routing mitigations cannot be applied region-wide (blast-radius containment) | Google SRE / networking | Improvement identified in incident report per The Register - public commitment not independently confirmed |
| Function-test redundant cooling units under near-design high ambient; verify economiser/chiller changeover at design-max | Google & Oracle facilities | Not evidenced in any public source (recommended) |
| Restore Persistent Disk redundancy and remediate HDD-backed volumes exhibiting IO errors | Google storage / Compute Engine | In progress at report time per public status page |
| Publish equipment/plant type and maintenance-test history to enable independent post-incident learning | Google & Oracle | Not done - disclosure gap |
Lessons learnt
- CLIMATE HAS MOVED THE DESIGN TAIL: 'Once-in-a-lifetime' ambient is now design-relevant; cooling worst-case envelopes calibrated on historical UK climate under-provision for 40C+ days and must be revised upward.
- 'REDUNDANT' IS NOT 'INDEPENDENT': N+1/N+2 duplication provides no protection when all units share the same failure driver (record ambient); redundancy must be diverse and common-mode-analysed, not merely duplicated.
- BLAST RADIUS IS OFTEN OPERATIONAL, NOT PHYSICAL: The largest widening of customer impact came from a human failover-tooling error (region-wide reroute), not the cooling failure itself - recovery-tooling discipline matters as much as the plant.
- EMERGENCY DE-ENERGISATION HAS ITS OWN COST: Protective thermal shutdown left HDD-backed Persistent Disks with IO errors and replicated PDs single-redundant - the 'safe' action still damaged data durability.
- MULTI-OPERATOR SAME-DAY FAILURE IS AN INDUSTRY SIGNAL: Two independent London operators failing on the same heat event points to a shared design-assumption gap across the sector, not an isolated site defect.
- DISCLOSURE WAS PARTIAL: Neither operator released equipment make/model/age, refrigerant, plant type, or maintenance/test history - limiting external learning and independent verification.
Improvements
- DESIGN HEAD-ROOM: Raise the cooling-plant worst-case design ambient and factory-test plant to it, so cooling retains capacity on 40C+ days rather than being 'required to operate above design limits'; UK worst-case envelopes set on historical climate are now obsolete.
- REDUNDANCY DIVERSITY (Safety-critical): Audit London (and comparable) plant for common-mode failure paths and single points of failure so that nominally 'redundant' units cannot be defeated simultaneously by a shared driver such as record ambient; add independent/diverse cooling paths, not just duplicated identical units.
- MAINTENANCE / FUNCTION-TESTING: Institute periodic function-testing of standby and redundant cooling units under near-design HIGH-ambient load (not only cool-day proof runs); verify chiller/economiser changeover and setpoints hold at design-max wet-bulb, and log test-under-load results.
- THERMAL-PROTECTION SAFETY RUNBOOK: Formalise a graceful, staged thermal load-shed runbook (migrate/drain workloads before hard VM termination where time permits) and validate BMS high-temperature alarm thresholds and shutdown setpoints to buy migration time and reduce abrupt-power-down data damage.
- RECOVERY-TOOLING GUARDRAILS: Add blast-radius containment to traffic-routing/failover tooling so a zone-scoped mitigation cannot be inadvertently applied region-wide (the europe-west2 all-three-zone reroute error).
- STORAGE DURABILITY: Harden Persistent Disk against abrupt de-energisation so emergency shutdown does not leave replicated volumes single-redundant or HDD-backed volumes with IO errors; prioritise redundancy-restore automation post-event.
- CUSTOMER RESILIENCE GUIDANCE: Reinforce multi-zone/multi-region architecture guidance, treating a single zone/building as a failure domain that can be lost to a facility-level thermal event.
References and provenance
- vendor-status Google Cloud Service Health - Incident XVq5om2XEDSqLtJZUvcH (Compute Engine cooling failure, europe-west2-a)“A small percentage of replicated Persistent Disk devices are now running in single redundant mode.”https://status.cloud.google.com/incidents/XVq5om2XEDSqLtJZUvcH
- press The Register - 'Heat wave knocks out Google, Oracle clouds in London' (2022-07-19)“As a result of unseasonal temperatures in the region, a subset of cooling infrastructure within the UK South (London) Data Centre has experienced an issue.”https://www.theregister.com/2022/07/19/google_oracle_cloud/
Quotes are short, attributed, and for provenance only; the analysis is original. Last verified 2026-08-02 (seed — pending deep research).