NORMAL 0 Critical 0 Warning 0 Stale Points Last Update --:--:-- Scenario Simulated Data Quality GOOD

Instant WUE

1.20 L/kWh
Target ≤ 1.30 · computed

Cooling Makeup Flow

37.0 L/min
Normal 30–55 · WUE-incl

Total Treatment Flow

45.0 L/min
Makeup + domestic

Filter DP

0.40 bar
Backwash > 0.80

Treated TDS

140 ppm
Limit < 500
Water Treatment Process Flow — raw → filtration → treatment → cooling makeup / domestic / blowdown
FM-101 Mains / Meter 45.0 L/min 2.1 bar TK-101 Raw Tank 25 m³ 82% 20.5 m³ FLT-201 Media Filter In 2.4 bar Out 2.0 bar DP 0.40 bar XV-202 Backwash INHIBIT P-301 Booster Pump RUNNING 7.5 kW DOS-302 Cl₂ Dose 0.85 L/h 0.6 ppm UV-401 UV Steril. 99.8% TK-402 Domestic Tank 30 m³ 88% 26.4 m³ MK-501 Make-up Water System 37.0 L/min BD 9.2 L/min Domestic / Service 8.0 L/min Blowdown & Backwash → Drain
Engineering values are deterministic (engine basis) — sim animates trend only.
WUE Reconciliation
IT Load1,850 kW
IT Energy (1 h)1,850 kWh
WUE-incl water (1 h)2,220 L
Instant WUE1.20 L/kWh
24 h WUE1.18 L/kWh
WUE = WUE-included water volume ÷ IT energy (computed from conv-engine, not static).
Water Scope Split
Cooling makeup WUE 37.0 L/min
└ Evaporation27.6 L/min
└ Blowdown9.2 L/min
└ Drift0.18 L/min
Domestic / process EXCL 8.0 L/min
Total treatment 45.0 L/min
Total treatment 45.0 L/min − domestic 8.0 L/min = WUE-included makeup 37.0 L/min → reconciles dashboard WUE 1.20 vs all-flow 1.46 L/kWh.
Active Alarms & Status
  • OKRaw Tank TK-101 — 82% / 20.5 m³ (low < 30%)
  • OKDomestic Tank TK-402 — 88% / 26.4 m³ (low < 40%)
  • OKFilter FLT-201 — DP 0.40 bar (backwash > 0.80)
  • OKTreated TDS — 140 ppm (limit < 500)
  • OKUV-401 — 99.8% intensity, lamp healthy
  • OKDosing DOS-302 — cmd ON, run feedback OK
Filter DP & Cooling Makeup Flow — 24 h Trend — thresholds shown; current marker right edge
SYSTEMNORMAL
RAW TANK82%
PUMP P-301RUNNING
MAKEUP37.0 L/min
WUE1.20 L/kWh
UPTIME00:00:00