Total Cost of Ownership Analysis

Build vs. Colo vs. Cloud

Compare 5-year and 10-year Total Cost of Ownership across deployment models with real market data from 12 global regions

The "build or buy" decision can swing tens of millions of dollars over a decade — and most spreadsheet models quietly ignore half the variables.

Should you build your own facility, lease colocation space, or go all-in on cloud? The answer depends on scale, growth trajectory, region, and dozens of cost levers most models skip. This calculator uses 2025-2026 market data from Turner & Townsend, CBRE, Cushman & Wakefield, and IEA to model construction costs, wholesale colo rates, cloud pricing, and year-over-year inflation for power, staffing, and maintenance. Pick your region, set your capacity, and see which model wins — and more importantly, when the crossover happens.

12 global markets 3 deployment models Stacked cost breakdown Monte Carlo simulation (Pro)

General-purpose estimate — actual costs depend on vendor negotiations, site conditions, and procurement timing. Consult qualified professionals for investment decisions.

Sign In

Access Pro features including Monte Carlo simulation, sensitivity analysis, and PDF export.

Features: Monte Carlo, Sensitivity Tornado, Multi-Period Projection, Strategic Narrative, PDF export

Demo Account:
demo@resistancezero.com / demo2026

By signing in, you agree to our Terms & Privacy Policy.

N. Virginia — Market Data
Build Cost --
Colo Rate --
Power Rate --
Staff Cost --
Land Cost --
DC CAGR --
Source: Turner & Townsend DCCI 2025, CBRE H1 2025, IEA Electricity 2025
TCO Comparison
Best Option
--
N. Virginia5 MW, 5 years, Tier III
Build TCO
--
Colo TCO
--
Cloud TCO
--
Best Option
--
Build CAPEX
--
Initial investment
Yr 1 OPEX (Build)
--
Annual operating cost
Cost per kW
--
Best option effective
Breakeven Year
--
Build vs. Colo crossover
TCO Breakdown by Category
Dynamic Insight
Adjust the inputs to see a cost comparison...
Key Assumptions
All calculations performed client-side. No data leaves your browser.
Unlock Monte Carlo, Sensitivity Tornado, Multi-Period Projections & Strategic Narrative with Pro
Build: --/MW
Colo: --/kW/mo
Power: --/kWh
Staff: --/yr
Land: --/sqft
CAGR: --
Turner & Townsend DCCI 2025 CBRE H1 2025 Cushman & Wakefield 2025 IEA Electricity 2025-2026 Glassdoor / PayScale 2025

Detailed Cost Comparison

Cost Category Build Colo Cloud
Adjust inputs above to see detailed cost comparison
Methodology & Assumptions
Build Model
CAPEX = IT Load (MW) × Regional Cost/MW × Tier Multiplier. Annual OPEX includes power (IT × PUE × 8,760h × $/kWh), staffing (headcount × salary), maintenance (3% of CAPEX), insurance (0.7% of CAPEX), network ($20K/MW/mo), and overhead (4% of OPEX). Inflation applied per-category annually.
Colo Model
Annual lease = IT Load (kW) × Wholesale Rate ($/kW/mo) × 12 months. Includes setup fees ($50K/MW), reduced staffing (1.5 FTE/MW), network connectivity ($15K/MW/mo), and 3% overhead. Annual escalation of 3% applied to lease costs. Growth rate scales capacity requirements.
Cloud Model
Annual compute = IT Load (kW) × Cloud Rate ($420/kW/mo) × 12 × (1 - discount). Adds 15% for data egress, 10% for support tier, and 2% miscellaneous. Cloud inflation at 2.5% p.a. Growth rate compounds capacity. No CAPEX or staff required.
Disclaimer: This calculator provides estimates based on publicly available market data from Turner & Townsend, CBRE, Cushman & Wakefield, IEA, and industry benchmarks (2025-2026). Actual costs vary significantly based on specific site conditions, vendor negotiations, and market timing. Always consult with qualified professionals for investment decisions.
Sources: Turner & Townsend H1 2025, CBRE DC Trends 2025, IEA Energy Outlook Data vintage: 2025–2026 market benchmarks For investment decisions, consult a qualified DC infrastructure advisor